Reports: Boeing To Announce Second Delay To 787 Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Jan 15, 2008

Reports: Boeing To Announce Second Delay To 787 Program

Would Push First Flight To Late June, No 2008 Deliveries

ANN REALTIME REPORTING 01.15.08 1845 EST: Several sources, including The Wall Street Journal and Seattle Post-Intelligencer aerospace reporter James Wallace, say Boeing will announce a second delay to its 787 Dreamliner program early Wednesday.

"I have just confirmed from an industry source that Boeing will soon announce more delays in the 787," Wallace writes on his P-I blog. "As much as another three months, the source said, which would push the important power-on milestone from late January to late March, and first flight to around the end of June."

Wallace adds the latest delay will also prevent the delivery of the first 787 to launch customer All Nippon Airways this year.

That timeframe is in line with what was reported earlier in the Journal. That paper says the imminent announcement comes as Boeing continues to struggle with parts shortages, and other supplier issues.

"I would be surprised if a delay is anything less than three months," said John Plueger, president and COO of aircraft lessor International Lease Finance Corp. He said ILFC has been expecting more delays.

As ANN reported last week, several analysts predicted the planemaker might need to once again push off its development schedule for the composite-bodied aircraft... though earlier estimates pegged the additional delay at three weeks, which may now appear overly-optimistic.

Boeing announced a six-month delay to the 787 program last October -- a move that didn't draw much fire from airlines with orders for the Dreamliner. Whether the airlines' reaction would be as amicable this time around remains to be seen.

Stay tuned...

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

ANN's Daily Aero-Linx (04.14.24)

Aero Linx: Soaring Safety Foundation (SSF) The Soaring Safety Foundation (SSF) is the Training and Safety arm of the Soaring Society of America (SSA). Our mission is to provide ins>[...]

Classic Aero-TV: 'We're Surviving'-- Kyle Franklin Describes Airshow Life 2013

From 2013 (YouTube Version): Dracula Lives On Through Kyle Franklin... and We're NOT Scared! ANN CEO and Editor-in-Chief, Jim Campbell speaks with Aerobatic and airshow master, Kyl>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC