Thu, Apr 14, 2005
First Time In More Than Two Years
Discovery passed another critical milestone Thursday, as the
space shuttle's external fuel tank was filled to launch levels in
preparation for its return to flight. The test began at 0814 EDT on
Launch Pad 39B at Kennedy Space Center, FL.
During the test, the tank was filled with ultra-cold hydrogen
and oxygen propellants, known as "cryogenics." The test is designed
to evaluate how the tank, orbiter, Solid Rocket Boosters and ground
systems are performing under full "cryo-load."
Throughout testing, engineers observed the effectiveness of key
safety modifications made to the External Tank. NASA has replaced
the tank's original foam bipod ramp with a new heater system to
keep the fitting clear of ice. Experts also paid attention to the
newly designed "drip lip," which reduces ice accumulation on the
liquid oxygen feedline bellows.
During cryo-loading, NASA's ice/debris team inspected the tank,
evaluating ice and frost build-up. While ice formation is normal
during cryo-loading, the team compared its development to safety
testing completed at various research facilities around the
country.
The test concluded at 4 p.m. and was followed by approximately
two hours of propellant off-loading. The Rotating Service Structure
(RSS) will be rolled back into place by 7 p.m. Friday evening.
Hatch closure of Raffaello, the Italian-built Multi-Purpose
Logistics Module, also occurred at 9:18 a.m. in preparation for
launch aboard Discovery. The closure signifies yet another
significant milestone in NASA's steady progression toward Return to
Flight. Inside the 15-by-21 foot Raffaello are 12 "racks," which
hold parts, clothing, food and experiments bound for the
International Space Station. After the module's contents are
delivered, it will be filled with the Station's used supplies and
concluded experiments for transportation back to Earth.
More News
Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]
"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]
Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]
Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]
Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]