Pre-Launch Processing Begins For Ariane 5's Next Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Sep 19, 2009

Pre-Launch Processing Begins For Ariane 5's Next Launch

Planned Combined Payload Weight 17,600 Pounds

Arianespace's ability to accommodate the full range of payloads in its fast-paced launch schedule is demonstrated by preparations for the upcoming Ariane 5 mission - which involves parallel processing of Germany's COMSATBw-1 military relay satellite and the Amazonas 2 commercial telecom platform for Spain's HISPASAT.

COMSATBw-1 is in the S5C large preparation hall of the Spaceport's S5 payload preparation center where it is undergoing pre-launch checkout; while Amazonas 2 has been topped off with its propellant load in the S5B fueling and integration hall.

The S5 facility - which has three separate clean room zones - enables multiple passengers to be processed in parallel for Arianespace missions, and ensures high security for even the most sensitive of payloads. Its S5C high bay is the largest of the facility's preparation halls, providing a 7,500 sq. foot work area. The S5B is a 4,300 sq. foot dual-function hall capable of handling both satellite integration and fueling.

For Ariane 5's launch late this month, the heavy-lift vehicle's two passengers will have a combined payload weight of 17,600 pounds.

The 5,500 pound COMSATBw-1 plays an important role in the German Bundeswehr's (German Armed Forces) concept for network-centric operations. This spacecraft is designed to handle secure information for use by units on deployed missions - including voice, fax, data, video and multimedia applications, with a coverage area that stretches from America to eastern Asia.

Ariane 5 Launch

COMSATBw-1 will serve as the backbone of a strategic command infrastructure and interface for the Bundeswehr's tactical arms. Overall industrial responsibility for the secure communication program is with Milsat Services (a 75% Astrium/25% subsidiary of ND SatCom Defence).

The program's space segment prime contractor is EADS Astrium, which has booked its two spacecraft for Arianespace launches beginning with COMSATBw-1. Thales Alenia Space is responsible for integrating the Spacebus satellite bus, while Astrium's German subsidiary TESAT delivers the payloads.

Accompanying COMSATBw-1 on the upcoming Ariane 5 missions is Amazonas 2, which was built by EADS Astrium using the Eurostar E3000 spacecraft bus, and is to weigh approximately 12,100 pounds at liftoff. When operational with the Spanish-based HISPASAT telecommunications operator, Amazonas 2 will provide relay capacity over the Americas with a coverage area extending from Alaska to Tierra del Fuego. It carries 54 Ku-band transponders and 10 C-band transponders for the relay of a wide range of communications services, including direct-to-home television.

The mission with Amazonas 2 and COMSATBw-1 will be the fifth of seven flights in Arianespace's busiest launch year for Ariane 5 since its 1999 commercial service introduction.

FMI: www.arianespace.com

Advertisement

More News

ANN's Daily Aero-Linx (04.16.24)

Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]

Aero-News: Quote of the Day (04.16.24)

"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]

Airborne 04.10.24: SnF24!, A50 Heritage Reveal, HeliCycle!, Montaer MC-01

Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]

Airborne 04.12.24: SnF24!, G100UL Is Here, Holy Micro, Plane Tags

Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC