FAA: 10 Years Is Shortest Wait For Longmont, CO Airport Funds | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Nov 29, 2011

FAA: 10 Years Is Shortest Wait For Longmont, CO Airport Funds

Airport Master Plan Calls For 1,000 Foot Runway Extension

The master plan for Vance Brand Municipal airport (KLMO) in Longmont, CO, calls for a 1,000 foot extension of the 4,800 foot runway, but FAA officials say that no money will be available for the project for at least 10 years.

Airport manager Tim Barth said the FAA has made it clear that funding for runway extensions at smaller airports is "not a high priority" on its funding list. In an e-mail to members of the Airport Advisory Board, Barth said while the information may "not be what the ... Board wanted to hear, it is nonetheless the FAA's official position," according to a report in the Longmont, CO Times-Call.

The position is music to the ears of area NIMBYs, which have been steadfastly against the extension. While proponents say safety is the primary concern, local residents counter with the argument that a longer runway would attract larger and noisier airplanes. It's a debate that occurs in nearly every community in which a runway extension is planned.

Barth said in his e-mail that the FAA acknowledged the need for the extension "in order to accommodate the existing fleet" of aircraft at KLMO, and that it would approve the master plan so that the improvements can be considered in the future. At 4,800 feet, only 77 percent of the category B2 aircraft flying can safely use the airport. The extension would open up the facility to 90 percent of the fleet. KLMO is currently considered a B2 airport, according to Barth.

FMI: www.ci.longmont.co.us/airport/board

Advertisement

More News

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC