NASA Moves Shuttle Engines From Kennedy To Stennis | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 03.23.15

Airborne 03.24.15

Airborne 03.25.15

Airborne 03.26.15

Airborne 03.27.15

Airborne Hi-Def On YouTube

Airborne 03.23.15

Airborne 03.24.15

Airborne 03.25.15

Airborne 03.26.15

Airborne 03.27.15

Tue, Jan 17, 2012

NASA Moves Shuttle Engines From Kennedy To Stennis

RS-25Ds To Be Repurposed For SLS Heavy Lift Vehicles

The relocation of the RS-25D space shuttle main engine inventory from Kennedy Space Center's Engine Shop in Cape Canaveral, FL, is underway. The RS-25D flight engines, repurposed for NASA's Space Launch System, are being moved to NASA's Stennis Space Center in south Mississippi.

The Space Launch System (SLS) is a new heavy-lift launch vehicle that will expand human presence beyond low-Earth orbit and enable new missions of exploration across the solar system. The Marshall Space Flight Center in Huntsville, Ala., is leading the design and development of the SLS for NASA, including the engine testing program. SLS will carry the Orion spacecraft, its crew, cargo, equipment and science experiments to destinations in deep space.

"The relocation of RS-25D engine assets represents a significant cost savings to the SLS Program by consolidating SLS engine assembly and test operations at a single facility," said William Gerstenmaier, NASA’s Associate Administrator for Human Exploration and Operations Mission Directorate.

The RS-25Ds -- to be used for the SLS core stage -- will be stored at Stennis until testing begins at a future date. Testing is already under way on the J-2X engine, which is planned for use in the SLS upper stage. Using the same fuel system -- liquid hydrogen and liquid oxygen -- for both core and upper stages reduces costs by leveraging the existing knowledge base, skills, infrastructure and personnel.

"This enables the sharing of personnel, resources and practices across all engine projects, allows flexibility and responsiveness to the SLS program, and it is more affordable," said Johnny Heflin, RS-25D core stage engine lead in the SLS Liquid Engines Office at Marshall. "It also frees up the space, allowing Kennedy to move forward relative to commercial customers."

The 15 RS-25D engines at Kennedy are being transported on the 700-mile journey using existing transportation and processing procedures that were used to move engines between Kennedy and Stennis during the Space Shuttle Program. They will be relocated one at a time by truck.
Built by Pratt & Whitney Rocketdyne of Canoga Park, Calif. the RS-25D engine powered NASA’s space shuttle program with 100 percent mission success.

FMI: www.nasa.gov/sls

Advertisement

More News

Germanwings Pilot Apparently Locked Out Of Cockpit

CVR Indicates Pounding On Cockpit Door, Shouting For It To Be Opened Data retrieved from the Cockpit Voice Recorder (CVR) aboard the Germanwings Airbus A320 that went down in the F>[...]

Airborne 03.25.15: HR476 Opposed, AEA2015 LIVE Schedule, Airbus' 9000th A/C

Also: Nanchang CJ-6A, USAF T-X Program, UK AAIB Withholds Info, Aussie Aero-Politics, GPS Errors Found, ATC Reform House Bill HR 476 will eliminate G.I. training benefits for those>[...]

Airborne 03.26.15: Airbus Crash 'Pilot Induced', B-29 Rollout, CC Rockets Ready

Also: ALPA v UAVs, Aero-Community Update: XPrize, FAA Streamlines UAS COAs, Airport Infrastructure, ATC Reform, New SpaceX Rocket Data retrieved from the Cockpit Voice Recorder (CV>[...]

ANN's Daily Aero-Linx (03.27.15)

Fun Places To Fly It may still be cold and snowy where you are, but spring is here and the flying weather will soon start to get better everywhere.>[...]

ANN's Daily Aero-Term (03.27.15): Fly-By Waypoint

A waypoint designed to permit early turns, thus allowing the aircraft to roll out onto the center of the desired track to the next waypoint.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC