A350 XWB MSN001 Conducts 'Maximum Energy Rejected Take-Off' Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Jul 24, 2014

A350 XWB MSN001 Conducts 'Maximum Energy Rejected Take-Off' Test

One Of The Mandatory Tests For Certification Completed Successfully

Airbus has successfully performed the ‘Maximum Energy Rejected Take-Off’ (MERTO) test with the A350 MSN001 on the morning of Saturday 19th July at Istres Air Force Base in France. MERTO, which follows on from the previous ‘High Energy Rejected Take-Off’ (HERTO) preparation test conducted by MSN001 two months ago, is a part of the mandatory series of tests for certification.

This latest test is to confirm the braking system’s ability to safely stop the aircraft following a rejected take-off at high speed and high weight – using a set of worn-out brakes. As these brakes absorb the kinetic energy of the aircraft, they glow bright orange and reach a temperature of around 1,400 degrees centigrade by the time the aircraft has safely come to a standstill, whereupon the tires are deflated by special fuses. According to certification requirements, the aircraft then has to stay put for five minutes unassisted, after which firefighters are allowed to spray the wheels and brakes to cool them. The Airbus Test team received full support from the “DGA (Délégation Générale pour l’Armement) – Essais en vols”, which played a key role in facilitating the test.

MERTO is the A350 XWB program’s final major test before MSN005, one of two cabin-equipped development aircraft, embarks on ‘Route Proving’ in July. The programme has to date achieved more than 2,250 flight hours in around 540 flights, and is on track for certification in Q3 and first delivery to Qatar Airways in Q4.

(Image provided by Airbus)

FMI: www.airbus.com

Advertisement

More News

ANN's Daily Aero-Linx (04.16.24)

Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]

Aero-News: Quote of the Day (04.16.24)

"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]

Airborne 04.10.24: SnF24!, A50 Heritage Reveal, HeliCycle!, Montaer MC-01

Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]

Airborne 04.12.24: SnF24!, G100UL Is Here, Holy Micro, Plane Tags

Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC