STS-125's Fourth Spacewalk 'Difficult', One Spacewalk Left | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, May 18, 2009

STS-125's Fourth Spacewalk 'Difficult', One Spacewalk Left

Amazing Effort Does Not Come Without Complications

STS-125 mission specialists Mike Massimino and Mike Good completed the mission’s fourth spacewalk Sunday at 5:47 p.m. EDT. The spacewalkers continued repairs and improvements to the Space Telescope Imaging Spectrograph (STIS) that will extend the Hubble’s life into the next decade.

In the sixth longest spacewalk in history, Astronauts Mike Massimino and Michael Good tackled the intricate task of removing and capturing 111 screws to be able to revive the Hubble Space Telescope’s two-dimensional spectroscopy capability.

In the 8 hour, 2 minute spacewalk, Massimino and Good repaired the Space Telescope Imaging Spectrograph (STIS) by replacing a power supply board. STIS, installed on the Hubble Space Telescope in 1997, stopped working in August 2004 due to a power supply failure and was in a “safe mode.”

Though the removal of the many screws was expected to be difficult, a handrail gave Good and Massimino trouble. The handrail was obstructing the path of a fastener capture plate and one stripped bolt prevented it from coming free. Massimino followed steps developed quickly at the Goddard Spaceflight Center to carefully bend and break the handrail free so that the fastener capture plate could be installed. At about three hours into the spacewalk, Massimino broke the handrail free allowing the spacewalkers to proceed with the day’s tasks.

The initial aliveness test reported the STIS as working properly. The initial functional test was ended when the telescope put itself into “safe mode,” having reached a low thermal limit. The STIS is believed to be in good shape. Ground controllers will start the functional tests over again, once the telescope reaches a good temperature.

The STIS separates light into its component colors to reveal information about the chemical content, temperature and motion of planets, comets, stars, interstellar gas and galaxies. The information it can provide will help scientists better understand the physical properties of the material universe – putting the physics in astrophysics.

Massimino and Good were unable to get to the installation of the New Outer Blanket Layer (NOBL) on the outside of the telescope’s bay 8. Mission managers have asked Mission Specialists John Grunsfeld and Andrew Fuestel to add the installation of a partial set of blankets on bay 8 during Monday’s spacewalk. If time permits, the two may get to install the full set.

The crew was due to wake up Monday at 0431 to conduct the fifth and final spacewalk of the mission.

NASA has updated their plans for the Fifth spacewalk, "Our goal is to get the spacewalk done on time, which is scheduled to last 5 hours, 45 minutes. Batteries and the Fine Guidance Sensor tasks are our priorities for tomorrow's spacewalk. We will make a real time call where we are in the timeline after those tasks are complete on the go forward plan for the Bay 5 & 8 New Outer Blanket Layer installation tasks. For the baseline plan, we would do a partial Bay 8 and then go to the other side and do a full Bay 5."

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Linx (04.16.24)

Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]

Aero-News: Quote of the Day (04.16.24)

"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]

Airborne 04.10.24: SnF24!, A50 Heritage Reveal, HeliCycle!, Montaer MC-01

Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]

Airborne 04.12.24: SnF24!, G100UL Is Here, Holy Micro, Plane Tags

Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC