The Latest From SpaceX: New Launch Window March 20-25 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, Feb 26, 2006

The Latest From SpaceX: New Launch Window March 20-25

Static Test-Firing Possible March 17

SpaceX founder Elon Musk tells Aero-News the company has set a tentative launch window for the maiden flight of its Falcon 1 rocket. The window runs from March 20 through 25, with a static test-firing of the rocket's engine likely on March 17. By that time, SpaceX expects issues that popped up during the first static fire-test earlier this month -- which led to the scrubbing of the company's third launch attempt -- will be resolved.

Elon filled us on the latest:

The tentative launch window for the maiden flight of Falcon 1 is March 20 through 25. The gating items are receiving a shipment of liquid oxygen (LOX) from Hawaii and switching out the 2nd stage tank. Obviously, long term operations on Kwaj will require that we install a state-of-the-art, high reliability LOX plant on island. In the meantime, we will get through first launch with LOX shipments from Hawaii and whatever output we can generate from the sad, old clunker of a LOX plant that we currently own.

We are also replacing the 2nd stage tank, following discovery of a small leak. Fortunately, a Falcon 2nd stage tank just barely fits through the door of a standard cargo airplane (no C-17 required), so the flight is relatively inexpensive and readily available. Fixing the leak in the tank being shipped back is not a huge task, but also not something easily done far away from the factory. Countdown procedures have been modified to prevent such leaks from developing in the future.

The static fire performed during the last countdown attempt was really helpful as a preflight systems checkout, so we will be doing one again three or four days before the next countdown (most likely March 17). In addition, we are doing another systems review with DARPA, AF and NASA in early March.

FMI: www.spacex.com

Advertisement

More News

ANN's Daily Aero-Linx (04.16.24)

Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]

Aero-News: Quote of the Day (04.16.24)

"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]

Airborne 04.10.24: SnF24!, A50 Heritage Reveal, HeliCycle!, Montaer MC-01

Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]

Airborne 04.12.24: SnF24!, G100UL Is Here, Holy Micro, Plane Tags

Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC