EADS Advanced Air Refueling Boom System Passes 100 Flight Hours | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Jun 07, 2007

EADS Advanced Air Refueling Boom System Passes 100 Flight Hours

Pre-Contact Tests Conducted This Week

Representatives with EADS tell ANN the company's fly-by-wire boom has logged 35 test flights, and over 100 flight hours in evaluations that confirm the capabilities of the advanced military aerial refueling system.

The flight testing utilizes an A310 testbed aircraft equipped with the EADS Air Refueling Boom System (ARBS), and evaluations to date have focused on a full range of deployment conditions. 

One mission performed this week included the participation of a military fighter, which represented a receiver aircraft for refueling. The fighter flew in the pre-contact position behind the boom to test tanker-to-receiver communications, along with interrelated aerodynamic effects.

Developed in a $100 million EADS self-funded research and development effort, the ARBS provides highly accurate, reliable in-flight refueling – taking full advantage of modern fly-by-wire technology. The ARBS will equip five EADS KC-30B tanker aircraft ordered by the Royal Australian Air Force, along with three tankers for the United Arab Emirates (UAE).

The boom system also will be incorporated on the Northrop Grumman KC-30 Tanker, which is offered in the ongoing competition to modernize the US Air Force’s aerial refueling fleet.

EADS states the ARBS delivers a maximum nominal fuel flow rate of 1,200 US gallons per minute. It features an automatic load alleviation system that provides a large refueling envelope and enhanced controllability. The system’s all-electric design significantly reduces traditional failure rates and subsequent down times.

Using a 3D-vision surveillance system, the boom operator remotely controls ARBS operations from the cockpit during air-to-air refueling.

FMI: www.eads.com

Advertisement

More News

ANN's Daily Aero-Linx (04.17.24)

Aero Linx: Space Medicine Association (SMA) The Space Medicine Association of the Aerospace Medical Association is organized exclusively for charitable, educational, and scientific>[...]

ANN's Daily Aero-Term (04.17.24): Jamming

Jamming Denotes emissions that do not mimic Global Navigation Satellite System (GNSS) signals (e.g., GPS and WAAS), but rather interfere with the civil receiver's ability to acquir>[...]

ANN's Daily Aero-Linx (04.18.24)

Aero Linx: Warbirds of America The EAA Warbirds of America, a division of the Experimental Aircraft Association in Oshkosh, Wisconsin, is a family of owners, pilots and enthusiasts>[...]

Aero-News: Quote of the Day (04.18.24)

"From New York to Paris, this life-size replica of the Webb Telescope inspired communities around the world and, in doing so, invited friends and families to explore the cosmos tog>[...]

ANN's Daily Aero-Term (04.18.24): Hold-In-Lieu Of Procedure Turn

Hold-In-Lieu Of Procedure Turn A hold-in-lieu of procedure turn shall be established over a final or intermediate fix when an approach can be made from a properly aligned holding p>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC