Ariane-5 Failure May Be Due to Cracks | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Jan 09, 2003

Ariane-5 Failure May Be Due to Cracks

Newest -5 Design Iteration Affected; Base Design OK

There may have been cracks in the cooling circuits of the hot-rodded Ariane-5 that blew up last month; and those cracks, while critical, aren't something that's likely to really foul up the entire European launch system.

The formal Inquiry Board, set up after the failed December launch attempt, concluded that, "...the most probable cause of the failure of Flight 157 was the simultaneous occurrence of two aggravating factors:

  • The degraded thermal condition of the nozzle due to fissures in the cooling tubes, and
  • Non-exhaustive definition of the loads to which the Vulcain 2 engine is subjected during flight

The board also noted that it would be difficult to simulate these additional loads during ground tests.

The newest-version Ariane-5 certainly needs attention, though.

On Wednesday, Arianespace boss Jean-Yves LeGall told the AP, "I consider that the generic Ariane-5 has been cleared by the commission’s work. We have no worries about the basic Ariane-5 launcher." Apparently, not all the rocket's engines failed; the asymmetric thrust, as well as the overall loss of power, doomed December's launch.

That kind of good news/bad news statement needs to be put into perspective. The Vulcain-2 engine is what makes the latest -5 such a workhorse: it can send 10 tons of expensive stuff into orbit, as opposed to the Vulcain-1's 7-ton limit.

The Vulcain-2 is slated to launch three times in 2003; repairs and modifications are expected to take six months. LeGall says the Vulcain-1-powered rockets will handle this year's launches, if necessary -- the heavier payloads aren't scheduled for at least a year.

The smaller Ariane-4 rockets continue to be launched and might shoulder some of the short-term launch load, even though their production has already stopped. The next Ariane-4 launch is set for February 11.

FMI: report

Advertisement

More News

ANN's Daily Aero-Linx (04.16.24)

Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]

Aero-News: Quote of the Day (04.16.24)

"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]

Airborne 04.10.24: SnF24!, A50 Heritage Reveal, HeliCycle!, Montaer MC-01

Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]

Airborne 04.12.24: SnF24!, G100UL Is Here, Holy Micro, Plane Tags

Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC