EASA Grants STC For King Air F-90 Series PT6A-135A Engine Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Jan 10, 2011

EASA Grants STC For King Air F-90 Series PT6A-135A Engine Program

StandardAero Receives Authorization For Engine Upgrades

The European Aviation Safety Agency (EASA) has granted an STC to StandardAero to re-engine the Hawker Beechcraft King Air F90 aircraft with Pratt & Whitney Canada (P&WC) PT6A-135A engines. This is the same engine that is Type Certified on King Air F90-1 aircraft. StandardAero is the only PT6A designated overhaul facility that can offer customers maintenance, repair, and overhaul (MRO) as well as PT6A engine upgrade options. 
 
"PT6A-135 engines have been in service for more than 30 years, many of which are approaching their third and fourth overhaul," said Manny Atwal, Vice President, Turboprop Programs. "Low Cycle Fatigue replacement, Service Bulletin requirements and customer build specifications are driving up overhaul and maintenance costs.  With our engine-upgrade program, customers can get a brand new PT6A-135A engine for a slightly higher cost than overhauling their aging PT6A-135 engines, while increasing performance, aircraft value, and reducing future engine maintenance costs."


File Photo

Upgrading to the StandardAero PT6A-135A engine program provides Beechcraft King Air F90 operators with the latest in P&WC engine technology, increased aircraft value and increased performance. StandardAero also offers extended warranty coverage to 10 years or base time-before-overhaul.

FMI: www.standardaero.com

Advertisement

More News

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC