Runway Construction Nearly Complete At Kissimmee, FL Gateway Airport | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, May 21, 2014

Runway Construction Nearly Complete At Kissimmee, FL Gateway Airport

Normal Operations Expected To Resume By June 6

The City of Kissimmee Gateway Airport announces that the construction on Runway 06/24 is coming to a close.  The construction is coming into its final phase, which will include cutting grooves into the new asphalt to improve braking action. While this work will take place during normal business hours during the week of May 29 thru June 1, there is a potential for noise and vibration to be encountered by those in close proximity to the airport.  The runway is expected to return to normal operations by Friday, June 6.

Runway 06/24 is only operated when strong winds blow out of the east or west, or when the main runway is closed for maintenance or aircraft emergencies, however these events can mean the runway is used continuously for several days at a time.
 
The $2.7 million dollar project, funded by the FAA, Florida Department of Transportation and Kissimmee Gateway Airport funds, was the first major resurfacing since the 1980’s, and the new LED airfield lights installed as part of the project will generate significant energy savings.

(Image provided by City of Kissimmee, FL)

FMI: www.kissimmeeairport.com

Advertisement

More News

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

ANN's Daily Aero-Linx (04.14.24)

Aero Linx: Soaring Safety Foundation (SSF) The Soaring Safety Foundation (SSF) is the Training and Safety arm of the Soaring Society of America (SSA). Our mission is to provide ins>[...]

Classic Aero-TV: 'We're Surviving'-- Kyle Franklin Describes Airshow Life 2013

From 2013 (YouTube Version): Dracula Lives On Through Kyle Franklin... and We're NOT Scared! ANN CEO and Editor-in-Chief, Jim Campbell speaks with Aerobatic and airshow master, Kyl>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC