NASA's Space Launch System Program Kicks Off Preliminary Design Review | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Jun 21, 2013

NASA's Space Launch System Program Kicks Off Preliminary Design Review

Process Is Expected To Last Several Weeks

NASA is beginning a preliminary design review for its Space Launch System (SLS). This major program assessment will allow development of the agency's new heavy-lift rocket to move from concept to initial design.

The preliminary design review process includes meticulous, detailed analyses of the entire launch vehicle. Representatives from NASA, its contractor partners and experts from across the aerospace industry validate elements of the rocket to ensure they can be safely and successfully integrated.

"This phase of development allows us to take a critical look at every design element to ensure it's capable of carrying humans to places we've never been before," said Dan Dumbacher, NASA's deputy associate administrator for exploration systems development in Washington. "This is the rocket that will send humans to an asteroid and Mars, so we want to be sure we get its development right."

The review process will take several weeks and is expected to conclude this summer.

"The preliminary design review is incredibly important, as it demonstrates the SLS design meets all system requirements within acceptable risk constraints, giving us the green light for proceeding with the detailed design," said Todd May, manager of the SLS Program at NASA's Marshall Space Flight Center in Huntsville, AL. "We are on track and meeting all the milestones necessary to fly in 2017."

The SLS is targeted for a test launch with no crew aboard in 2017, followed by a mission with astronauts to study an asteroid by as early as 2021. NASA is developing the SLS and its new Orion spacecraft to provide an entirely new capability for human exploration. It will be flexible for launching spacecraft for crew and cargo missions, expand human presence beyond low-Earth orbit and enable new missions of exploration in the solar system.

(Images provided by NASA)

www.nasa.gov/sls

Advertisement

More News

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC