Air Force Proposes Initial JSF Locations | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.09.24

Airborne-Unlimited-04.10.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Oct 05, 2006

Air Force Proposes Initial JSF Locations

Stateside Bases Include Active, Reserve Personnel

Officials with the US Air Force announced Thursday plans are underway for initiating environmental analyses for proposed locations of the Air Force's newest fighter, the F-35A Lightning II Joint Strike Fighter.

The initial Joint Strike Fighter locations include Eglin Air Force Base, FL for primary maintenance and flight training; Nellis AFB, NV and Edwards AFB, CA for flight-testing; and Hill AFB, UT, Kadena Air Base, Japan, and Shaw AFB/McEntire ANGB, SC for operational squadrons. Both stateside operational bases will combine active duty and Reserve Component personnel to maximize flexibility and combat capability.

"Our environmental analyses will facilitate our decision-making process as these locations are evaluated," said General T. Michael Moseley, Air Force Chief of Staff. "With this announcement, the Air Force will begin the environmental analysis process, which could take up to two years. Future environmental analyses will study traditional Air National Guard and Air Force Reserve bases along with a selection of Active Duty bases.

"The capabilities we provide the joint warfighter are in high demand, yet we have the oldest aircraft inventory in our history," said General Moseley. "The Air Force will continue to invest in advanced capabilities needed to defeat the emerging technological advances of our adversaries."

The Air Force states the F-35A Lightning II basing plan will create a synergistic "Total Force" mix of Active, Guard and Reserve units operating its newest 5th generation fighter aircraft. The Total Force mix provides the best possible team to deliver sovereign options for the defense of the United States in the war on terrorism.

The Air Force is expected to start taking delivery of F-35A aircraft in 2009 with planned deliveries continuing beyond 2025.

FMI: www.af.mil

Advertisement

More News

ANN's Daily Aero-Linx (04.13.24)

Aero Linx: Florida Antique Biplane Association "Biplanes.....outrageous fun since 1903." That quote really defines what the Florida Antique Biplane Association (FABA) is all about.>[...]

ANN's Daily Aero-Term (04.13.24): Beyond Visual Line Of Sight (BVLOS)

Beyond Visual Line Of Sight (BVLOS) The operation of a UAS beyond the visual capability of the flight crew members (i.e., remote pilot in command [RPIC], the person manipulating th>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC