First Production VH-71 To Start Final Production Phase | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Jan 12, 2009

First Production VH-71 To Start Final Production Phase

Integration Of Helo's Systems Begins At Owego Facility

The first Lockheed Martin pilot production VH-71 presidential helicopter to begin the integration and final production process arrived at the company's Owego, NY, facility Friday. Six of nine helicopters that make up the first phase of the VH-71 presidential helicopter program are now in the US, including four test-configured aircraft and two production aircraft.

"The arrival of this production aircraft to the Lockheed Martin facility here is a great start to the new year, after a very successful year for the program in 2008," said Jeff Bantle, Lockheed Martin VH-71 vice president and general manager. "Four years into the program, six aircraft are in the US undergoing flight testing or integration, systems integration laboratories are fully functional and the helicopter is meeting or exceeding all key performance parameters."

The helicopter, pilot production aircraft number three (PP-3), will now be integrated with mission systems, outfitted with a cabin interior, painted in presidential livery and flight tested before being delivered to the US Navy and ultimately to Marine Helicopter Squadron One.

Two VH-71 test aircraft are also at the facility, undergoing mission systems installation. At Naval Air Station Patuxent River, MD two additional test helicopters are conducting flight testing, while production aircraft PP-1, which joined the test program November 24, is conducting ground vibration testing, after which it will also be flown to Lockheed Martin's Owego facility for integration and completion.

The VH-71 program is divided into two phases, or increments. Increment One provides five helicopters on an accelerated schedule with improved capabilities over the current fleet. Increment Two will provide a fleet of 23 helicopters that complete the White House requirements for a command and control platform.

FMI: www.lockheedmartin.com/

Advertisement

More News

ANN's Daily Aero-Linx (04.15.24)

Aero Linx: International Flying Farmers IFF is a not-for-profit organization started in 1944 by farmers who were also private pilots. We have members all across the United States a>[...]

Classic Aero-TV: 'No Other Options' -- The Israeli Air Force's Danny Shapira

From 2017 (YouTube Version): Remembrances Of An Israeli Air Force Test Pilot Early in 2016, ANN contributor Maxine Scheer traveled to Israel, where she had the opportunity to sit d>[...]

Aero-News: Quote of the Day (04.15.24)

"We renegotiated what our debt restructuring is on a lot of our debts, mostly with the family. Those debts are going to be converted into equity..." Source: Excerpts from a short v>[...]

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.16.24): Chart Supplement US

Chart Supplement US A flight information publication designed for use with appropriate IFR or VFR charts which contains data on all airports, seaplane bases, and heliports open to >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC