Nose Job: Airbus Gets First A380 Nose Gear | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Jan 21, 2004

Nose Job: Airbus Gets First A380 Nose Gear

Largest Gear Ever Supplied By Messier-Dowty

On Monday, Messier-Dowty announced the delivery of the first test A380 nose landing gear to Airbus UK. Standing at 4.8 meters tall when fully extended, the A380 nose landing gear is the largest landing gear ever supplied by Messier-Dowty to Airbus. The gear will be fitted to the Airbus system test rig located in Filton, England to allow Airbus UK to perform the aircraft systems testing validation.

"This hand over of the first A380 nose landing gear marks the latest milestone in Messier-Dowty’s long and successful history with Airbus," said Louis Le Portz, chairman and CEO.  "As landing gear supplier for all existing Airbus in service aircraft, Messier-Dowty is proud of its contribution to the world’s largest airliner."

Messier-Dowty was selected in 2001 to design, manufacture, test and support the nose landing gear for the Airbus A380. The nose gear development benefits from Messier-Dowty's extensive experience on previous Airbus aircraft, including the A340-600, and will ensure a future growth capability of the aircraft up to 620 tons.

This nose landing gear introduces new innovations in terms of landing gear development, namely the introduction of 350-bar hydraulic pressure never before used on large commercial aircraft, as well as the use of an HVOF (High Velocity Oxygen Fuel) surface treatment process instead of chromium plating.  Main components of the A380 nose landing gear, such as the main fitting and sliding tube, will be produced in Montreal, Canada and in Bidos, France, respectively. Bidos will also serve as the center for final assembly. Main testing for the nose landing gear will take place in Gloucester, UK and at the CEAT center in Toulouse, France. Eight A380 nose landing gear shipsets will be manufactured in 2004.

The maiden flight for the A380 is scheduled for early 2005 with entry in service scheduled for 2006. The Airbus order book for the A380 now stands at 129 aircraft.

Messier-Dowty, a Snecma Group company, designs, develops, manufactures and supports landing gear systems. 

FMI: www.messier-dowty.com

Advertisement

More News

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC