Gulfstream Expands Research & Development Facility | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.09.24

Airborne-Unlimited-04.10.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, Oct 23, 2005

Gulfstream Expands Research & Development Facility

750 Engineers To Work At Larger Center

Gulfstream Aerospace is preparing to significantly increase its research and development department by leasing a new 100,000 sq. ft. building at its Savannah, GA manufacturing facility. Gulfstream expects to bring as many as 750 engineers from other buildings under one roof in the new facility by March of 2006.

"For the past decade, Gulfstream has led the business aviation industry in technological advancements that enhance passenger safety and aircraft reliability and performance," said Gulfstream president Bryan Moss. "With our continued R&D efforts on advanced avionics, advanced cabin technologies, synthetic vision and sonic boom suppression, we expect this expansion will allow us to maintain our market leadership in this industry."

The manufacturer, a wholly-owned subsidiary of General Dynamics, leased the new building for five years, according to a company press release.

"Since we first opened our doors in Savannah 38 year ago, our business has grown significantly. In fact, we’ve added four other manufacturing sites and eleven service center sites located throughout the United States as well as a service center in England," said Moss.

"Now it’s time to expand our research and development organization. Both the Georgia Department of Economic Development (GDED) and the Savannah Economic Development Authority (SEDA) were instrumental in our selection of Savannah as the site for this expansion," he said.

Gulfstream employs approximately 7,000 people, of which rougly 5,200 work at the company’s Savannah facility.

FMI: www.gulfstream.com

Advertisement

More News

ANN's Daily Aero-Linx (04.13.24)

Aero Linx: Florida Antique Biplane Association "Biplanes.....outrageous fun since 1903." That quote really defines what the Florida Antique Biplane Association (FABA) is all about.>[...]

ANN's Daily Aero-Term (04.13.24): Beyond Visual Line Of Sight (BVLOS)

Beyond Visual Line Of Sight (BVLOS) The operation of a UAS beyond the visual capability of the flight crew members (i.e., remote pilot in command [RPIC], the person manipulating th>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC