NASA Plans To Roll Atlantis Back Sunday | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.09.24

Airborne-Unlimited-04.10.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, Mar 04, 2007

NASA Plans To Roll Atlantis Back Sunday

Crews Will Inspect Hail Damage

Fingers are crossed at NASA, as crews prepare to roll back the space shuttle Atlantis to the Vehicle Assembly Building in order to better assess damage caused by a storm last week. Roll back is currently targeted for Sunday morning.

As Aero-News reported, the STS-117 vehicle stack is returning to the VAB so engineers and technicians can thoroughly inspect the shuttle for hail damage that resulted from a violent storm on Monday evening. Once inspections are complete, a decision will be made on the type of repair necessary and the time needed for that work.

On Thursday, workers at the pad offloaded the fuel and oxidizer from the orbiter maneuvering system tanks. Crews opened the orbiter's payload bay doors, and work was underway Saturday to remove the payload from the cargo bay. Demating of the shuttle from the pad systems continued through Saturday, with rotation of the pads' rotating service structure scheduled for early Sunday morning.

Earlier in the week, the Space Shuttle Program managers met for a two-day STS-117 Flight Readiness Review. During this meeting managers and engineers review risks associated with the mission and determine whether the shuttle's equipment, support systems and procedures are ready for flight.

At the conclusion of the FRR, there was a unanimous decision to proceed with the STS-117 mission, pending resolution of the open work to make necessary repairs to the hail damage on the shuttle.

FMI: www.nasa.gov/mission_pages/shuttle/news/index.html

Advertisement

More News

ANN's Daily Aero-Linx (04.13.24)

Aero Linx: Florida Antique Biplane Association "Biplanes.....outrageous fun since 1903." That quote really defines what the Florida Antique Biplane Association (FABA) is all about.>[...]

ANN's Daily Aero-Term (04.13.24): Beyond Visual Line Of Sight (BVLOS)

Beyond Visual Line Of Sight (BVLOS) The operation of a UAS beyond the visual capability of the flight crew members (i.e., remote pilot in command [RPIC], the person manipulating th>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC