US Navy, Boeing Sign $2 Billion Order For 13 P-8A Poseidon Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Aug 06, 2013

US Navy, Boeing Sign $2 Billion Order For 13 P-8A Poseidon Aircraft

Plans Call For 117 P-8A Aircraft, Which Are Based On Boeing 737-800

The U.S. Navy recently awarded Boeing a $1.98 billion contract for 13 additional P-8A Poseidon aircraft, continuing the modernization of U.S. maritime patrol capabilities that will ultimately involve more than 100 P-8As. The contract includes long-lead funding previously approved by the Navy. 

The Navy has now ordered 37 of the 117 P-8As it is expected to buy. To date, 10 have been delivered. Based on the Boeing Next-Generation 737-800 commercial airplane, the P-8 provides anti-submarine, anti-surface warfare as well as intelligence, surveillance and reconnaissance capabilities. The P-8 is replacing the Navy’s P-3 aircraft. 

“We’re on budget and on schedule and the Navy will stand up initial operational capability of this transformational aircraft by the end of the year,” said Rick Heerdt, Boeing vice president and P-8 program manager. 

“This new contract award will continue to deliver aircraft to the fleet squadrons scheduled to receive their initial batch of P-8As on cost, schedule and performance parameters in accordance with the approved Acquisition Program Baseline,” said Capt. Scott Dillon, the Maritime Patrol and Reconnaissance Aircraft Program Office’s program manager.

Boeing assembles P-8As in the same facility where it builds all its 737s. The Poseidon team uses a first-in-industry in-line process that takes advantage of the efficiencies in the Next-Generation 737 production system. After initial assembly, the   P-8A aircraft enter a separate mission system installation and checkout facility for final modifications and testing.

Initial operational test and evaluation (IOT&E) was completed in March; the Navy announced July 1 that the P-8A program had passed IOT&E and the P-8A was ready for fleet introduction.

(P-8 Poseidon image from file)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (04.15.24)

Aero Linx: International Flying Farmers IFF is a not-for-profit organization started in 1944 by farmers who were also private pilots. We have members all across the United States a>[...]

Classic Aero-TV: 'No Other Options' -- The Israeli Air Force's Danny Shapira

From 2017 (YouTube Version): Remembrances Of An Israeli Air Force Test Pilot Early in 2016, ANN contributor Maxine Scheer traveled to Israel, where she had the opportunity to sit d>[...]

Aero-News: Quote of the Day (04.15.24)

"We renegotiated what our debt restructuring is on a lot of our debts, mostly with the family. Those debts are going to be converted into equity..." Source: Excerpts from a short v>[...]

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.16.24): Chart Supplement US

Chart Supplement US A flight information publication designed for use with appropriate IFR or VFR charts which contains data on all airports, seaplane bases, and heliports open to >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC