Shuttle Endeavour Ferry Flight Rescheduled To September 19 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Sep 19, 2012

Shuttle Endeavour Ferry Flight Rescheduled To September 19

Weather Again Delays The Last Trip For The Spacecraft

NASA's ferry flight of space shuttle Endeavour atop the 747 Shuttle Carrier Aircraft (SCA) has been rescheduled for Wednesday, Sept. 19 due to an unfavorable weather forecast along the flight path on Tuesday, Sept. 18. Endeavour now is expected to arrive at Los Angeles International Airport (LAX) on Friday, Sept. 21.

On Oct. 11, 2011, NASA transferred title and ownership of Endeavour to the California Science Center in Los Angeles. The decision to reschedule the flight was made Monday in coordination with the science center to ensure a safe flight for Endeavour and the SCA. Weather predictions are favorable Wednesday for the flight path between Houston and NASA’s Kennedy Space Center, where the flight will originate.

In cooperation with the FAA, the SCA is scheduled to conduct low-level flyovers at about 1,500 feet above locations along the planned flight path. The exact timing and path of the ferry flight will depend on weather conditions and operational constraints. Some planned flyovers or stopovers could be delayed or cancelled. If the ferry flight is postponed again, an additional advisory will be issued.

At sunrise on Sept. 19, the SCA and Endeavour will depart Kennedy's Shuttle Landing Facility and perform a flyover of various areas of the Space Coast, including Kennedy, the Kennedy Space Center Visitor Complex, Cape Canaveral Air Force Station and Patrick Air Force Base. The aircraft will fly west and conduct low flyovers of NASA's Stennis Space Center in Mississippi and the agency's Michoud Assembly Facility in New Orleans. As it arrives over the Texas Gulf Coast area, the SCA will perform low flyovers above various areas of Houston and Clear Lake before landing at Ellington Field near NASA's Johnson Space Center.

At sunrise on Thursday, Sept. 20, the aircraft will depart Houston, make a refueling stop at Biggs Army Airfield in El Paso, TX, and conduct low-level flyovers of White Sands Test Facility near Las Cruces, NM, and NASA's Dryden Flight Research Center at Edwards Air Force Base in CA, before landing around mid-day at Dryden. Options for the NASA Social at Dryden are being evaluated. Attendees for the event will be notified by the NASA social media team once plans are decided.

On the morning of Sept. 21, the SCA and Endeavour will take off from Dryden and perform a low-level flyover of northern California, passing near NASA's Ames Research Center at Moffett Field, CA, and various landmarks in multiple cities, including Sacramento and San Francisco. The aircraft also will conduct a flyover of many Los Angeles sites before landing about 1100 PDT at LAX.

After arrival at LAX, Endeavour will be removed from the SCA and spend a few weeks at a United Airlines hangar undergoing preparations for transport and display. Endeavour then will travel through Inglewood and Los Angeles city streets on a 12-mile journey from the airport to the science center, arriving in the evening on Oct. 13.

Beginning Oct. 30, the shuttle will be on display in the science center's Samuel Oschin Space Shuttle Endeavour Display Pavilion, embarking on its new mission to commemorate past achievements in space and educate and inspire future generations of explorers.

Endeavour completed 25 missions, spent 299 days in orbit, and orbited Earth 4,671 times while traveling 122,883,151 miles.

FMI: www.nasa.gov/transition

Advertisement

More News

ANN's Daily Aero-Linx (04.16.24)

Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]

Aero-News: Quote of the Day (04.16.24)

"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]

Airborne 04.10.24: SnF24!, A50 Heritage Reveal, HeliCycle!, Montaer MC-01

Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]

Airborne 04.12.24: SnF24!, G100UL Is Here, Holy Micro, Plane Tags

Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC