E-8C's New Engine Program Takes Off | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.09.24

Airborne-Unlimited-04.10.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Dec 06, 2008

E-8C's New Engine Program Takes Off

JSTARs To Fly With More-Efficient Turbofans

America's eye in the sky, the E-8C Joint Surveillance Target Attack Radar System, or Joint STARS, will soon be faster, quieter, more efficient and more operationally effective with a major engine upgrade effort now underway at Hanscom AFB in Massachusetts.

Getting new engines on E-8C test aircraft is a major milestone for the Air Force, said Col. Jim Lovell, the 751st Electronic Systems Group commander. "The reliability and fuel efficiency of these new engines will yield huge benefits to the warfighter -- it's all about improving operational capability," he said.

The E-8C is an airborne battle management, command and control, intelligence, surveillance and reconnaissance platform. Its primary mission is to provide theater ground and air commanders with ground surveillance to support attack operations and targeting that contributes to the delay, disruption and destruction of enemy forces.

"We are in the final stages of installing the entire propulsion pod system -- Pratt and Whitney JT8D engines, Seven-Q-Seven pylons, instrumentation, and thrust reversers -- on the Air Force government-owned test aircraft at the prime contractor facility in Melbourne, Fla.," said Maj. Ryan Knapp, the re-engining program manager in the 633rd Electronic Systems Squadron. "We are on track for our upcoming first flight with the T-3 (test aircraft)."

For that to happen, the propulsion pod system had to be removed from the commercially-owned 707 aircraft previously used to complete the supplemental test certification program in Mojave, CA earlier this year. The commercial aircraft was flown to Florida, where prime contractor Northrop Grumman is removing the pod system from the Boeing jet and putting it on the T-3.

While the re-engining of the E-8C has been years in the making, accomplishing this upgrade will yield immediate and significant benefits to the warfighter.

Among them is the flexibility for the aircraft to depart from runways of shorter length. Equipped with its current engines, E-8C takeoffs are currently limited by runway length, fuel load and environmental conditions. This limitation usually results in an increased need for tanker aircraft support.

The new engines also increase fuel efficiency by 17 percent, yielding savings in fuel and -- by extension -- time that's critical in collecting data. When the aircraft needs to refuel, it breaks its time "on station," meaning that it has to leave to get gas and then work sometimes hours to re-establish situational awareness and communications.

"Every time that happens, the bad guys can potentially be moving around on the ground without someone watching them, and then the Joint STARS has to come back and lock on," said Rainy McIntosh, also of the 633 ELSS. "Those types of breaks in situational awareness are not going to happen."

Additionally, the new engines will eliminate engine overheating currently experienced by the operator -- another limitation, especially during summer months when temperatures can reach well above 100 degrees. With the current engines in place, the aircraft could be limited to nighttime operations during those months.

The new engine will allow for 24-hour-a-day and seven-day-a-week operations, regardless of high temperatures, Major Knapp said.

The first flight of a JSTARS equipped with the new engines is scheduled for December 17. Contract actions will be negotiated in early 2009, with a contract award on the horizon a few months later. This will eventually help solidify the management portion of the program office.

After the E-8C's first flight with the new engines, the T-3 test aircraft will undergo an E-8C specific airworthiness certification test program scheduled to start in early 2009 and last through the middle of that year.

FMI: www.af.mil

Advertisement

More News

ANN's Daily Aero-Linx (04.13.24)

Aero Linx: Florida Antique Biplane Association "Biplanes.....outrageous fun since 1903." That quote really defines what the Florida Antique Biplane Association (FABA) is all about.>[...]

ANN's Daily Aero-Term (04.13.24): Beyond Visual Line Of Sight (BVLOS)

Beyond Visual Line Of Sight (BVLOS) The operation of a UAS beyond the visual capability of the flight crew members (i.e., remote pilot in command [RPIC], the person manipulating th>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC