Urgent CASA AD: Eurocopter | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Nov 16, 2006

Urgent CASA AD: Eurocopter

Applicability: EC 130 B4 helicopters, all serial numbers, modified in accordance with MOD 073774 (Installation of screws/nuts in place of the attachments of the lower fairings with “blind” nuts) and not embodying Eurocopter drawing 350A085340.

Requirement:

1. For affected EC 130 B4 helicopters not modified in accordance with Eurocopter drawing 350A085342 - Check the condition of the electrical harnesses and the attachment, carry out the corrective actions if necessary and protect the electrical harnesses in accordance with the instructions described in paragraphs 2.B.1 through 2.B.3 (corresponding to Eurocopter drawing 350A085342) and 2.B.5 of Emergency Alert Service Bulletin (ASB) 88A001 dated 10 November 2006 or later approved version.

2. Check the condition of the electrical harnesses, carry out the corrective actions and install the clamp blocks in accordance with the instructions described in paragraphs 2.B.1, 2.B.2.a, 2.B.4 (corresponding to Eurocopter drawing 350A085340) and 2.B.5 of ASB 88A001 or later approved version.

Note 1: Compliance with Requirement 2 within 10 flight hours after the effective date of this Directive makes compliance with Requirement 1 redundant.

Note 2: EASA Emergency AD 2006-0344-E refers.

Compliance:

For Requirement 1 - Within 10 hours time in service (TIS) after the effective date this Directive

For Requirement 2 - Within 550 hours TIS or within 2 years after the effective date of this Directive, whichever occurs first. This Airworthiness Directive becomes effective on 16 November 2006.

Background: Eurocopter has advised the European Aviation Safety Agency (EASA) of a report of an in flight incident which led to the inflation of the emergency floatation gear and the activation of various warnings. Investigations have revealed that a screw that secures the RH lower centre fairing interfered with an electrical harness and caused several short circuits, resulting in the inflation of the emergency floatation gear.

The purpose of this Directive is to detect and prevent any interference between the electrical harnesses and the bottom structure fairing attachment screws post MOD 073774. Embodiment of a modification in accordance with Eurocopter drawing 350A085342 is considered to be a temporary (interim) solution, to ensure that there is no interference. Embodiment of a modification in accordance with Eurocopter drawing 350A085340 is the permanent solution that can be applied according to the availability of the helicopter and components.

FMI: www.casa.gov.au

Advertisement

More News

ANN's Daily Aero-Linx (04.16.24)

Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]

Aero-News: Quote of the Day (04.16.24)

"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]

Airborne 04.10.24: SnF24!, A50 Heritage Reveal, HeliCycle!, Montaer MC-01

Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]

Airborne 04.12.24: SnF24!, G100UL Is Here, Holy Micro, Plane Tags

Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC