C-130J Drops Five Bundles | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Apr 25, 2005

C-130J Drops Five Bundles

Look Out Below

C-130J Hercules are now dropping up to five large bundles of supplies. A C130J successfully completed the first  five-bundle sequential low velocity airdrop at Edwards Air Force Base last Tuesday. They landed about 1000 feet apart, and only five yards away from the target.

The 418th Flight Test Squadron rigged and released the 40,100 pounds of cargo over a range area to test software upgrades and systems. Before this test, the aircraft capability was limited to four bundles, according to Tech. Sgt. Jason Kunkel, a 418th FTS loadmaster, speaking to the AF news.

"Right now, we're doing everything we need to do before the aircraft graduates to operational testing," he said. "By working closely with the contractor, we were able to identify and fix deficiencies to ensure the Air Force received a workable system."

The software upgrades enhanced the cargo-handling, communication, navigation and identification systems. Testers are determining how the upgrades affect other systems.

One essential system for air drops is the Extraction Parachute Jettison System. "The EPJS is a safety system that keeps the loadmaster from having to go behind the load if it doesn't extract from the aircraft," Sergeant Kunkel said. "If a load doesn't extract, the largest parachutes can produce 50,000 pounds of drag for the aircraft."

The system was successfully evaluated April 19th and worked well. The C-130J increases cargo delivery, decreases aircrew needs, and has an increased sortie reliability rate according to Sergeant Kunkel.

The program is scheduled to move to Little Rock Air Force Base, AR in October for operational test and evaluation.

FMI: www.af.mil

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC