Integration Begins For Airbus’ Next-Generation Beluga XL | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne-Unmanned w/AUVSI-
Tuesday

Airborne Unlimited-
Wednesday

AMA Drone Report-
Thursday

Airborne Unlimited-
Friday

Airborne On ANN

Airborne 04.16.18

Airborne-UnManned 04.17.18

Airborne 04.18.18

AMA Drone Report 04.19.18

Airborne 04.20.18

Airborne-YouTube

Airborne 04.16.18

Airborne-UnManned 04.17.18

Airborne 04.18.18

AMA Drone Report 04.19.18

Airborne 04.20.18

Wed, Jan 11, 2017

Integration Begins For Airbus’ Next-Generation Beluga XL

Process Expected To Take 18 Months

Airbus’ next-generation oversize cargo airlifter is transitioning from concept to reality as the first Beluga XL core airframe starts its 18-month integration process at the company’s production facilities in Toulouse, France.

The core airframe is an extract of an Airbus A330-200 freighter that already has been structurally reinforced, providing the platform on which the Beluga XL airframe will be built. This element was assembled in December without a nose fuselage or tail assembly – both of which will be added during activity planned in 2017.

Integration of the Beluga XL core airframe will be performed inside the two-section L34 building at Airbus’ Lagardère industrial zone, which is adjacent to Toulouse-Blagnac Airport.

For the first 12 months of the assembly activity, the airframe will be completed and its mechanical and electrical systems will be fitted at an integration station. For the remaining six months, the aircraft will move to a second station for ground testing and engine installation.

“The coming year of final integration will be a series of small steps,” said Beluga XL program head Bertrand George. “The number of holes to be drilled and fasteners to be installed is far bigger than on any other Airbus aircraft. Sticking to schedule at each step is the key to being ready for first flight in 2018. I fully trust the capability of our teams to make it happen together.”

Based on the airframe of the versatile A330 jetliner, a total of five Beluga XL airlifters are to be built, with the first to enter operational service in 2019. They will gradually replace the existing fleet of Beluga ST aircraft, which were derived from the shorter-fuselage A300.

Once the first Beluga XL enters service, it will provide crucial support to Airbus’ production ramp-up from day one thanks to its ability to carry a full set of A350 XWB wings.

(Image provided with Airbus news release)

FMI: www.airbus.com

Advertisement

More News

Airborne-Unmanned 04.17.18: XPO 2018, Drone Broadcasts, Airbus Inspection Drone

Also: NZ AFB Drone Incident, Police UAVs, Inaugural Drone Boot Camp, Predator 5M Flight Hours This is it! THE major unmanned exposition of the year -- AUVSI XPONENTIAL 2018 starts >[...]

Airborne 04.18.18: FAA Reauthorization, New Bose, Std. Libelle 201 BE

Also: USAF Changes ARFF Standards, Aims Community College, Trent 1000 Package C Update, Global 7000 Extends The House Transportation and Infrastructure Committee has introduced a b>[...]

Airborne 04.18.18: FAA Reauthorization, New Bose, Std. Libelle 201 BE

Also: USAF Changes ARFF Standards, Aims Community College, Trent 1000 Package C Update, Global 7000 Extends The House Transportation and Infrastructure Committee has introduced a b>[...]

Airborne 04.16.18: Terrafugia Jobs, Planes Of Fame Airshow, King Schools

Also: A321LR Goes Long, Elbit Acquires Universal, Becker Avionics, Avionica MiniQAR Terrafugia created 75 new US-based jobs within the past 12 months and is on track to add at leas>[...]

AMA Drone Report 04.12.18: AMA Counters CDA, Night FPV, Google Drone Issues

Also: Drone Assists SAR, Strategic UAV Partnership, Russian Mail Drone Crash, Gold Coast Commonwealth Games As noted in the last AMA Drone Report, the Commercial Drone Alliance has>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2018 Web Development & Design by Pauli Systems, LC