Embraer Reports Progress On Phenom 300 Development | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Mar 31, 2009

Embraer Reports Progress On Phenom 300 Development

Fourth Aircraft Joins Test Fleet

Brazilian planemaker Embraer tells ANN it is moving "steadily forward" with its Phenom 300 light jet program, with the first flight of the fourth test aircraft at the end of February 2009.

This jet, with registration number PP-XVL, and the third (PP-XVK), which first flew on December 23, 2008, are being operated from the Company’s Flight Test Center at the Gavião Peixoto plant, in Brazil, alongside the first two Phenom 300 executive jets.

The test fleet is comprised of four aircraft: two fully instrumented, one equipped with basic interior and flight test instrumentation, and another with interior furnishings, which will be used for function and reliability tests and in the maturity campaign. So far, the entire fleet has performed over 300 hours of test flight campaign.

"As the Phenom 300 light jet certification and maturity campaign progresses, the deliveries of the first Phenom 100 entry level jets are taking place," said Maurício Almeida Filho, Embraer Vice President, Programs – Executive Jets. "We expect this crucial phase for the Phenom 300 to be every bit as successful as it was for the Phenom 100."

Flight and ground tests are presently moving ahead, having already concluded in-flight engine thrust determination (IFTD) and restart, water spray, fire extinguishing, fuel tests, and artificial ice shapes, among others. The Phenom 300 has flown at an altitude of 45,000 feet, while maintaining the cabin altitude as low as 6,600 feet. It has demonstrated the maximum cruising speed of 450 knots (KTAS), or 833 km/h, and Mach 0.78. Rigs have been used to refine avionics, to check the airplane’s environmental systems, and to test the electrical system.

Ongoing tests include aerodynamics and natural ice, as well as data collection for the full flight simulator development. The autopilot is being put through its paces, and avionics tests are successfully proceeding. Lightning strike, High Intensity Radiated Field (HIRF), external noise, crosswinds, and cold soak tests are scheduled to begin, soon.

The Phenom 300 certification campaign will require around 1,400 flight hours, and progresses toward its conclusion in the second half of 2009. The Phenom 100 and Phenom 300 light jets have a combined sales backlog of more than 800 aircraft, according to Embraer.

FMI: www.embraer.com

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC