Boeing 787 Dreamliner Completes First Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Dec 16, 2009

Boeing 787 Dreamliner Completes First Flight

All-New Boeing Airplane Touches Down Safely After 3-Hour Mission

The Boeing 787 Dreamliner took to the sky for the first time Tuesday, ushering a new era in air travel as it departed before an estimated crowd of more than 12,000 employees and guests from Paine Field in Everett, WA. The flight marks the beginning of a flight test program that will see six airplanes flying nearly around the clock and around the globe, with the airplane's first delivery scheduled for fourth quarter 2010.

The newest member of the Boeing family of commercial jetliners took off from Paine Field in Everett, Wash. at 1027 PST. After approximately three hours, it landed at 1333 PST at Seattle's Boeing Field.

787 Chief Pilot Mike Carriker and Capt. Randy Neville tested some of the airplane's systems and structures, as on-board equipment recorded and transmitted real-time data to a flight-test team at Boeing Field.

Capt. Randy Neville, Chief Pilot Mike Carriker
Boeing Video Capture

After takeoff from Everett, the airplane followed a route over the east end of the Strait of Juan de Fuca. Capts. Carriker and Neville took the airplane to an altitude of 15,000 feet and an air speed of 180 knots, or about 207 miles per hour, customary on a first flight.

"Today is truly a proud and historic day for the global team who has worked tirelessly to design and build the 787 Dreamliner - the first all-new jet airplane of the 21st century," said Scott Fancher, vice president and general manager of the 787 program. "We look forward to the upcoming flight test program and soon bringing groundbreaking levels of efficiency, technology and passenger comfort to airlines and the flying public."

Powered by two Rolls-Royce Trent 1000 engines, the first Boeing 787 will be joined in the flight test program in the coming weeks and months by five other 787s, including two that will be powered by General Electric GEnx engines.

The technologically-advanced 787 will use 20 percent less fuel than today's airplanes of comparable size, provide airlines with up to 45 percent more cargo revenue capacity and present passengers with innovations that include a new interior environment with cleaner air, larger windows, more stowage space, improved lighting and other passenger-preferred conveniences.

Fifty-five customers around the world have ordered 840 787s, making it the fastest-selling new commercial jetliner in history.

FMI: www.boeing.com

 


Advertisement

More News

ANN's Daily Aero-Linx (04.17.24)

Aero Linx: Space Medicine Association (SMA) The Space Medicine Association of the Aerospace Medical Association is organized exclusively for charitable, educational, and scientific>[...]

ANN's Daily Aero-Term (04.17.24): Jamming

Jamming Denotes emissions that do not mimic Global Navigation Satellite System (GNSS) signals (e.g., GPS and WAAS), but rather interfere with the civil receiver's ability to acquir>[...]

ANN's Daily Aero-Linx (04.18.24)

Aero Linx: Warbirds of America The EAA Warbirds of America, a division of the Experimental Aircraft Association in Oshkosh, Wisconsin, is a family of owners, pilots and enthusiasts>[...]

Aero-News: Quote of the Day (04.18.24)

"From New York to Paris, this life-size replica of the Webb Telescope inspired communities around the world and, in doing so, invited friends and families to explore the cosmos tog>[...]

ANN's Daily Aero-Term (04.18.24): Hold-In-Lieu Of Procedure Turn

Hold-In-Lieu Of Procedure Turn A hold-in-lieu of procedure turn shall be established over a final or intermediate fix when an approach can be made from a properly aligned holding p>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC