AD: Eurocopter Deutschland GmbH Helicopters | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Jun 26, 2012

AD: Eurocopter Deutschland GmbH Helicopters

AD NUMBER: 2012-11-02

PRODUCT: Certain Eurocopter Deutschland GmbH (ECD) Model EC135 helicopters.
SUBJECT: Airworthiness Directive 2012-11-02
ACTION: Final rule; request for comments.

SUMMARY: The FAA is adopting a new airworthiness directive (AD) that supersedes an existing Emergency Airworthiness Directive (EAD) for the products listed above. The existing EAD, which was previously sent to all known U.S. owners and operators of ECD Model EC135 helicopters and not made generally effective by publication in the Federal Register, currently requires inspecting the ring frame between the rear structure tube (tailboom) and the tail rotor fenestron housing (fenestron housing) for a crack before the first flight of each day and replacing any cracked ring frame with an airworthy ring frame. Since we issued that EAD, we have determined that a pre-flight pilot check in conjunction with a recurring 25-hour inspection is sufficient for determining the airworthiness of the ring frame. Additionally, ECD has developed a modification that is terminating action for the requirements of that EAD. This superseding AD revises the inspection requirements of the EAD to allow an owner/operator to perform the pre-flight pilot check, adds a recurring inspection of the ring frame, and allows for installation of a ring frame reinforcement as an optional terminating action for the AD requirements.

The actions are intended to detect a crack in the ring frame which could result in loss of the fenestron structure and subsequent loss of control of the helicopter.

DATES: This AD becomes effective July 10, 2012. Comments on this AD are due by August 24, 2012.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC