FAA Issues Emergency AD For Boeing 737s | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Mar 15, 2010

FAA Issues Emergency AD For Boeing 737s

Order Will Affect Some 600 Aircraft

The FAA has issued an Emergency AD (2010-06-51) for all Boeing 737-600, -700, -700C, -800, -900, and -900ER series airplanes. The FAA received a report of failure of the aft attach lugs on the left elevator tab control mechanism, which resulted in severe elevator vibration. The flightcrew diverted from the intended route and made an uneventful landing. Subsequent investigation revealed extensive damage to the elevator tab control system. Severe vibration in this attach point is suspected of allowing rapid wear of the joint, and resulted in failure of the attach lugs. The FAA says that his condition, if not corrected, could result in a loss of aircraft control and structural integrity.

In its investigation, the FAA reviewed Boeing Alert Service Bulletin 737-27A1296, dated March 12, 2010. The service bulletin describes procedures for a detailed inspection to detect discrepancies of the inboard and outboard aft attach lugs of the elevator tab control mechanism. Discrepancies include movement or rotation of the spacer, and gaps between the swage ring and the aft attach lug or between the spacer and the aft attach lug. The service bulletin describes procedures for replacing any discrepant elevator tab control mechanism, including performing the detailed inspection on the replacement part before and after installation. For certain airplanes, the compliance time for the inspection is 12 or 30 days, depending on airplane line number, total accumulated flight cycles, and approval for operation under extended twin operations (ETOPS).

As a result, the FAA is issuing the AD to detect and correct a loose bearing in the aft lug of the elevator tab control mechanism, which could result in unwanted elevator and tab vibration. The consequent structural failure of the elevator or horizontal stabilizer could result in loss of aircraft control and structural integrity. The AD requires accomplishing the actions specified in the service information described previously, except as discussed under “Differences Between this AD and the Service Bulletin,” and also requires reporting the inspection results to Boeing.

FMI: www.faa.gov, www.boeing.com

Advertisement

More News

SpaceX to Launch Inversion RAY Reentry Vehicle in Fall

Inversion to Launch Reentry Vehicle Demonstrator Aboard SpaceX Falcon 9 This fall, the aerospace startup Inversion is set to launch its Ray reentry demonstrator capsule aboard Spac>[...]

Aero-News: Quote of the Day (04.23.24)

"We are excited to accelerate the adoption of electric aviation technology and further our journey towards a sustainable future. The agreement with magniX underscores our commitmen>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.20.24)

Aero Linx: OX5 Aviation Pioneers Each year a national reunion of OX5 Aviation Pioneers is hosted by one of the Wings in the organization. The reunions attract much attention as man>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC