U.S. Army Greenlights Apache AH-64D Low Rate Initial Production | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne-Unmanned w/AUVSI-
Tuesday

Airborne Unlimited-
Wednesday

AMA Drone Report-
Thursday

Airborne Unlimited-
Friday

Airborne On ANN

Airborne 04.23.18

Airborne-UnManned 04.24.18

Airborne 04.18.18

AMA Drone Report 04.19.18

Airborne 04.20.18

Airborne-YouTube

Airborne 04.23.18

Airborne-UnManned 04.24.18

Airborne 04.18.18

AMA Drone Report 04.19.18

Airborne 04.20.18

Tue, Oct 26, 2010

U.S. Army Greenlights Apache AH-64D Low Rate Initial Production

Eight Block III Helos To Be Built For $247 Million

The U.S. Army has given the go-ahead to Boeing to begin Low Rate Initial Production (LRIP) for the U.S. Army’s AH-64D Apache Block III helicopter. The contract, announced Monday, is reportedly worth $247 million and covers production of eight Apache Block III helicopters in the Lot 1 configuration. It was signed by the U.S. government October 22.


Apache AH-64D

An Acquisition Decision Memorandum signed by the Department of Defense on October 7 authorized the program to enter the LRIP phase to produce 51 aircraft. The first LRIP delivery is scheduled for October 2011. The Apache Block III helicopter enhances the capabilities of the combat-proven AH-64D Apache by delivering superior flight performance and dramatically increased networked communications capabilities. "The road map for the Apache Block III program has been clearly defined and the U.S. Army and Boeing are successfully working together to provide these advanced attack helicopters to soldiers in the field," said Lt. Col. Dan Bailey, Apache Block III product manager for the Army.

"Working together throughout the Apache Block III program's system development and demonstration phase since 2006, the Army, Boeing and our industry teammates have achieved our objectives on cost and on schedule," said Scott Rudy, Apache Block III program manager for Boeing. "I'm confident that the team will continue to effectively apply its collective expertise as the program moves into the production phase."

The current Army acquisition objective is for 690 AH-64D Apache Block III aircraft. The helicopters will be assembled, flight tested and delivered from the Boeing Global Strike facility in Mesa. Key enhancements for aviators will include an improved drive system featuring the 701D engine, composite main rotor blades and a new split-torque face gear transmission, as well as increased networked communications capabilities.


Apache AH-64D

The Apache Block III features open systems architecture and 26 advanced technology improvements, including level 4 unmanned aerial vehicle control for increased situational awareness. This helicopter configuration has already demonstrated the flexibility to rapidly integrate technology changes throughout its service life.

FMI: www.boeing.com, www.army.mil

Advertisement

More News

UPDATE: The Dirtiest of Washington Politics? -- ATC Privatization By Deception?

Stunning, Deceptive, Dirty Politics... Shuster Is At It Again, But This Time We Need To React FAST! ANN RealTime News Update, 04.24.18, 2302 ET: Well... initial info suggests that >[...]

AMA Drone Report 04.19.18: AMA Leadership, FAA Reauthorization, Coachella

Also: New French Regs, Drone Boot Camp, Public Safety Drone Standards, DroneShield Protects NASCAR It’s a little bit sad and yet a bit cool to see AMA make an exciting change>[...]

Airborne/Barnstorming 04.23.18: We Can Do So Much Better...

I'll Admit It... We're A Mite Frustrated, But We're ALSO Not Quitting... Ever Comments/Analysis/News/Video by ANN CEO/Editor-In-Chief, Jim Campbell We've accomplished so much over >[...]

Airborne 04.23.18: Hemisphere Suspended, Thunderbirds Fly, Apple v Drones

Also: New NASA Administrator, AD For CFM56-7B, Engine Display Upgrade On C-441, First BBJ MAX Textron Aviation has suspended work on the Citation Hemisphere large business jet, cit>[...]

ANNouncement: Now Accepting Applications For Oshkosh 2018 Stringers!!!

An Amazing Experience Awaits The Chosen Few... E-I-C Note: There's very little we can say yet, but there is a reason why this may be THE year to throw in with ANN to cover the extr>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2018 Web Development & Design by Pauli Systems, LC