U.S. Army Greenlights Apache AH-64D Low Rate Initial Production | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 05.02.16

Airborne 05.03.16

Airborne 05.04.16

Airborne 05.05.16

Airborne 05.06.16

Airborne Hi-Def On YouTube

Airborne 05.02.16

Airborne 05.03.16

Airborne 05.04.16

Airborne 05.05.16

Airborne 05.06.16

AEA2016 LIVE Aero-TV: 04/27-0830ET, 04/28-1400ET, 04/29-1100ET

Sun 'n Fun 2016 Innovation Preview on Vimeo!

Sun 'n Fun 2016 Innovation Preview on YouTube!

Tue, Oct 26, 2010

U.S. Army Greenlights Apache AH-64D Low Rate Initial Production

Eight Block III Helos To Be Built For $247 Million

The U.S. Army has given the go-ahead to Boeing to begin Low Rate Initial Production (LRIP) for the U.S. Army’s AH-64D Apache Block III helicopter. The contract, announced Monday, is reportedly worth $247 million and covers production of eight Apache Block III helicopters in the Lot 1 configuration. It was signed by the U.S. government October 22.


Apache AH-64D

An Acquisition Decision Memorandum signed by the Department of Defense on October 7 authorized the program to enter the LRIP phase to produce 51 aircraft. The first LRIP delivery is scheduled for October 2011. The Apache Block III helicopter enhances the capabilities of the combat-proven AH-64D Apache by delivering superior flight performance and dramatically increased networked communications capabilities. "The road map for the Apache Block III program has been clearly defined and the U.S. Army and Boeing are successfully working together to provide these advanced attack helicopters to soldiers in the field," said Lt. Col. Dan Bailey, Apache Block III product manager for the Army.

"Working together throughout the Apache Block III program's system development and demonstration phase since 2006, the Army, Boeing and our industry teammates have achieved our objectives on cost and on schedule," said Scott Rudy, Apache Block III program manager for Boeing. "I'm confident that the team will continue to effectively apply its collective expertise as the program moves into the production phase."

The current Army acquisition objective is for 690 AH-64D Apache Block III aircraft. The helicopters will be assembled, flight tested and delivered from the Boeing Global Strike facility in Mesa. Key enhancements for aviators will include an improved drive system featuring the 701D engine, composite main rotor blades and a new split-torque face gear transmission, as well as increased networked communications capabilities.


Apache AH-64D

The Apache Block III features open systems architecture and 26 advanced technology improvements, including level 4 unmanned aerial vehicle control for increased situational awareness. This helicopter configuration has already demonstrated the flexibility to rapidly integrate technology changes throughout its service life.

FMI: www.boeing.com, www.army.mil

Advertisement

More News

Airborne 05.05.16: Huerta at AUVSI, F22 Coming Back?, Flt School Leaves SMO

Also: Canadian Airshows, SAFE, Airbus A350 XWB, Master Instructors, No-Fly Violin, Brussels Reopens, Echodyne Speaking yesterday at the AUVSI XPONENTIAL conference in New Orleans, >[...]

Airborne 05.05.16: Huerta at AUVSI, F22 Coming Back?, Flt School Leaves SMO

Also: Canadian Airshows, SAFE, Airbus A350 XWB, Master Instructors, No-Fly Violin, Brussels Reopens, Echodyne Speaking yesterday at the AUVSI XPONENTIAL conference in New Orleans, >[...]

Aero-News: Quote Of The Day (05.06.16)

“This resolution expresses our thanks to the brave aviators who serve in the Coast Guard for their heroic life-saving efforts and instrumental role in keeping our nation safe>[...]

ANN's Daily Aero-Linx (05.06.16)

NTSB Aviation Accident Database The NTSB aviation accident database contains information from 1962 and later about civil aviation accidents and selected incidents within the United>[...]

ANN's Daily Aero-Term (05.06.16): Nonapproach Control Tower

Authorizes aircraft to land or takeoff at the airport controlled by the tower or to transit the Class D airspace. The primary function of a nonapproach control tower is the sequenc>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2016 Web Development & Design by Pauli Systems, LC