Fri, Oct 14, 2005
NOTAM: 5/9482
Issued: 10/14/2005 16:30
Effective: 10/14/2005 20:00 - Undetermined
State: DC
Facility: ZDC - WASHINGTON (ARTCC),DC.
Type: SECURITY
Description: SPECIAL NOTICE... VFR TRAFFIC PATTERN
OPERATIONS AT CERTAIN AIRPORTS. EFFECTIVE 0510142000 UTC (OCTOBER
14, 2005, AT 1600 LOC...
FDC 5/9482 ZDC PART 1 OF 2 ...SPECIAL NOTICE... VFR
TRAFFIC PATTERN OPERATIONS AT CERTAIN AIRPORTS. EFFECTIVE
0510142000 UTC (OCTOBER 14, 2005, AT 1600 LOCAL) UNTIL FURTHER
NOTICE. PURSUANT TO 14 CFR SECTION 99.7, SPECIAL SECURITY
INSTRUCTIONS, AND 91.139, EMERGENCY AIR TRAFFIC RULES. THIS NOTICE
AMENDS THE REQUIREMENTS/PROCEDURES DETAILED IN FDC NOTAM 5/9477 FOR
THE WASHINGTON DC METROPOLITAN AREA AIR DEFENSE IDENTIFICATION ZONE
(ADIZ)(EXCLUDING THOSE AIRPORTS IN THE WASHINGTON, DC, METROPOLITAN
AREA FLIGHT RESTRICTED ZONE). THE FOLLOWING PROCEDURES ARE IN
EFFECT. A. PILOTS CONDUCTING VFR TRAFFIC PATTERN OPERATIONS (NOT
INCLUDING PRACTICE INSTRUMENT APPROACHES) AT AN AIRPORT WITH AN
OPERATIONAL AIRPORT TRAFFIC CONTROL TOWER WITHIN THE ADIZ SHALL: 1.
MAKE THEIR REQUEST FOR CLOSED PATTERN WORK PRIOR TO TAXIING, OR
PRIOR TO TRAFFIC PATTERN ENTRY; 2. REMAIN IN TWO-WAY RADIO
COMMUNICATIONS WITH THE TOWER; 3. CONTINUOUSLY OPERATE THEIR
AIRCRAFT TRANSPONDER ON CODE 1234 WHEN ASSIGNED BY ATC. B. PRIOR TO
EXITING THE TRAFFIC PATTERN OR CONDUCTING ANY OTHER FLIGHT
OPERATIONS WITHIN THE ADIZ, PILOTS SHALL: 1. FILE A FLIGHT PLAN
WITH AN AFSS; END PART 1 OF 2
FDC 5/9482 ZDC PART 2 OF 2 ...SPECIAL NOTICE...
VFR TRAFFIC PATTERN 2. OBTAIN AND CONTINUOUSLY TRANSMIT AN ATC
ASSIGNED DISCRETE TRANSPONDER CODE; 3. ESTABLISH TWO-WAY RADIO
COMMUNICATIONS WITH ATC. C. DOD AIRCRAFT OPERATING IN THE VFR
TRAFFIC PATTERN OF A MILITARY AIRPORT MAY BE ASSIGNED A CODE OTHER
THAN 1234. D. FOR PILOTS OPERATING UNDER THE PROVISIONS OF
PARAGRAPH A, ABOVE, A FLIGHT PLAN IS NOT REQUIRED SO LONG AS THE
AIRCRAFT REMAINS EXCLUSIVELY WITHIN THE AIRPORT VFR TRAFFIC PATTERN
OF THE SAME AIRPORT. E. PILOTS WHO DO NOT ADHERE TO THE ABOVE
PROCEDURES CAN EXPECT TO BE INTERCEPTED BY FEDERAL LAW
ENFORCEMENT/SECURITY PERSONNEL OR DOD. END PART 2 OF 2
More News
"As previously announced on February 29th, our IM-1 mission ended seven days after landing, as Odysseus' mission was not intended to survive the harsh temperatures of the lunar nig>[...]
Marker Beacon An electronic navigation facility transmitting a 75 MHz vertical fan or boneshaped radiation pattern. Marker beacons are identified by their modulation frequency and >[...]
Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]
Also: Moron With A Laser, EAA Aviation Museum, FAA v Santa Monica Propeller Service, Frontier MEC Lauds FO Boom Supersonic has confirmed details surrounding the successful first te>[...]
We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]