ADs (2): Rolls-Royce | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.09.24

Airborne-Unlimited-04.10.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Jan 03, 2003

ADs (2): Rolls-Royce

AD NUMBER:  2002-23-12
MANUFACTURER: Rolls Royce
SUBJECT:  Airworthiness Directive 2002-23-12
SUMMARY:  This amendment adopts a new airworthiness directive (AD) that is applicable to Rolls-Royce Limited, Aero Division-Bristol, S.N.E.C.M.A (RR) Olympus 593 Mk. 610-14-28 turbojet engines.

This action requires a one-time fluorescent penetrant inspection (FPI) of certain rebroached stage 5 high pressure compressor (HPC) disks, inspecting for cracks, and if necessary, removing cracked disks from service. This amendment is prompted by a manufacturer's analysis that concluded that the rebroaching process failed to achieve the anticipated life before being rejected for cracks and that the original cracks are not being removed. The actions specified in this AD are intended to prevent failure of the HPC stage 5 disk which could result in an uncontained engine failure and damage to the airplane.

FMI: www.avantext.com/DailyADIndex.ASP?AD=20022312

AD NUMBER:  2002-26-04
MANUFACTURER: Rolls Royce
SUBJECT:  Airworthiness Directive 2002-26-04
SUMMARY:  This amendment adopts a new airworthiness directive (AD) that is applicable to certain serial number (SN) Rolls-Royce Limited, Aero Division-Bristol, S.N.E.C.M.A. (RR) Olympus 593 Mk.610-14-28 turbojet engines, installed in BAe/SNIAS Concorde Type 1 airplanes. This action requires second stage fuel pump endurance bench-testing if the pump has not yet accumulated 50 flight hours since last installed and the bearing assembly and or the rotating assembly were removed or re-fitted during last pump removal. This amendment is prompted by a report of second stage fuel pumps that were not endurance bench-tested after having the bearing assembly and or the rotating assembly removed or re-fitted, and then installed on engines in service. The actions specified in this AD are intended to prevent a fuel leak resulting in a sustained engine fire.

FMI: www.avantext.com/DailyADIndex.ASP?AD=20022604

Advertisement

More News

ANN's Daily Aero-Linx (04.13.24)

Aero Linx: Florida Antique Biplane Association "Biplanes.....outrageous fun since 1903." That quote really defines what the Florida Antique Biplane Association (FABA) is all about.>[...]

ANN's Daily Aero-Term (04.13.24): Beyond Visual Line Of Sight (BVLOS)

Beyond Visual Line Of Sight (BVLOS) The operation of a UAS beyond the visual capability of the flight crew members (i.e., remote pilot in command [RPIC], the person manipulating th>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC