Mars Phoenix To Bake Ice-Rich Sample Next Week | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.09.24

Airborne-Unlimited-04.10.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Jul 05, 2008

Mars Phoenix To Bake Ice-Rich Sample Next Week

But TEGA Instrument May Short Circuit Again

The next sample delivered to NASA's Phoenix Mars Lander's Thermal and Evolved-Gas Analyzer (TEGA) will be ice-rich, researchers involved with the project said Thursday. But the instrument may once again have difficulties in determining that.

A team of engineers and scientists assembled to assess TEGA after a short circuit was discovered in the instrument, has concluded that another short circuit could occur when the oven is used again.

"Since there is no way to assess the probability of another short circuit occurring, we are taking the most conservative approach and treating the next sample to TEGA as possibly our last," said Peter Smith, Phoenix's principal investigator.

A sample taken from the trench informally named "Snow White" that was in Phoenix's robotic arm's scoop earlier this week likely has dried out, so the soil particles are to be delivered to the lander's optical microscope on Thursday, and if material remains in the scoop, the rest will be deposited in the Wet Chemistry Laboratory, possibly early on Sunday.

The mission teams marked the Independence Day holiday with a planned "stand down" from Thursday morning, July 3 to Saturday evening, July 5. A skeleton crew at the University of Arizona in Tucson, at NASA's Jet Propulsion Laboratory in Pasadena, CA, and Lockheed Martin Space Systems in Denver, CO will continue to monitor the spacecraft and its instruments over the holiday period.

"The stand down is a chance for our team to rest, but Phoenix won't get a holiday," Smith said. The spacecraft will be operating from pre-programmed science commands, taking atmospheric readings and panoramas and other images.

Once the sample is delivered to the chemistry experiment, Smith said the highest priority will be obtaining the ice-rich sample and delivering it to TEGA's oven number zero.

In a few days the Phoenix team will conduct tests so the instruments can deliver the icy sample quickly, so no materials sublimate, or change from a solid to a vapor, during the delivery process.

The short circuit was believed to have been caused when TEGA's oven number four was vibrated repeatedly over the course of several days to break up clumpy soil delivered to oven number 4. Delivery to any TEGA oven involves a vibration action, and turning on the vibrator in any oven will cause oven number 4 to vibrate as well.

FMI: www.nasa.gov/phoenix, http://phoenix.lpl.arizona.edu

Advertisement

More News

ANN's Daily Aero-Linx (04.13.24)

Aero Linx: Florida Antique Biplane Association "Biplanes.....outrageous fun since 1903." That quote really defines what the Florida Antique Biplane Association (FABA) is all about.>[...]

ANN's Daily Aero-Term (04.13.24): Beyond Visual Line Of Sight (BVLOS)

Beyond Visual Line Of Sight (BVLOS) The operation of a UAS beyond the visual capability of the flight crew members (i.e., remote pilot in command [RPIC], the person manipulating th>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC