FAA Clarifies Part 145 Letter of Compliance Requirement | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Jan 28, 2004

FAA Clarifies Part 145 Letter of Compliance Requirement

LOC Is NOT Required As Part Of The Part 145 Rewrite

The Aircraft Electronics Association (AEA) informs us the FAA has recommended that Part 145 certificate holders review their Letter of Compliance (LOC) or update it as a means to verify their compliance posture with respect to the new Part 145 rule.

This FAA recommendation is a request and has been left up to the discretion of the certificate holder to determine if it is, in fact, necessary.  If they choose not to update or submit an LOC, it will not affect the accomplishment of the FAA's review of manuals or other documents submitted to comply with the rule requirements.

The following is a letter from the FAA's Diana L. Frohn, Manager, AFS-340 to Ric Peri, AEA’s Vice President, Government and Industry Affairs, clarifying the LOC issue:

"As you know, the part 145 rule will finally be implemented on January 31, 2004. There is a lot of activity going on to transition IPMs to repair station and quality control manuals, to write any new procedures for new provisions offered by the rule, and to develop new processes and procedures to comply with the changing regulation.

Although there are several new requirements with this rule, updating or developing a new letter of compliance or compliance statement is not one of them. That being said, the FAA has recommended that certificate holders review their LOC or update it as a means to verify their compliance posture with respect to the
new rule. This has only been a request and has been left up to the discretion of the certificate holder to determine if it is, in fact, necessary.

If they choose not to update or submit an LOC, it will not affect the accomplishment of the FAA's review of manuals or other documents submitted to comply with the rule requirements."

The Association recommends that repair station’s review their original LOC for applicability, however, the additional administrative burden placed on repair stations by their local FAA office (inspector) is not acceptable.

FMI:  www.aea.net

Advertisement

More News

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

ANN's Daily Aero-Linx (04.14.24)

Aero Linx: Soaring Safety Foundation (SSF) The Soaring Safety Foundation (SSF) is the Training and Safety arm of the Soaring Society of America (SSA). Our mission is to provide ins>[...]

Classic Aero-TV: 'We're Surviving'-- Kyle Franklin Describes Airshow Life 2013

From 2013 (YouTube Version): Dracula Lives On Through Kyle Franklin... and We're NOT Scared! ANN CEO and Editor-in-Chief, Jim Campbell speaks with Aerobatic and airshow master, Kyl>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC