Major Expansion For Dnata As Dubai's Terminal 2 Nears Completion | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Mar 08, 2008

Major Expansion For Dnata As Dubai's Terminal 2 Nears Completion

37,000 Sq. Ft. Addition To Open At End Of March

Dnata’s operations at Terminal 2 at Dubai International Airport are set to increase dramatically with the opening of a 37,000 sq. ft. extension, scheduled for the end of March. This extension will increase the airport’s surface area to 93,000 sq. feet.

The expanded facilities will see Dnata Airport Operations servicing around 700 flights per week from Terminal 2, of which 320 will be cargo and 380 passenger-carrying operations. The company tells ANN this is an increase of around 50% on current passenger loads and will see a potential annual throughput of approximately five million passengers.

The new airport expansion will also welcome a wealth of new facilities, including six open boarding gates to replace the current system of five gates, each with a holding lounge -- a first for Dubai. Open boarding gates allow several flights to board simultaneously, help cut down traffic flow and thereby reduce boarding times significantly.

"We are very pleased to be working in conjunction with Dubai Civil Aviation, the owners of the airport, to bring these improvements to our commercial and cargo clients at Terminal 2," said Ahmed Langawi, Vice President, Terminal 2 Operations. "Since it was opened in 1998, Terminal 2 has enjoyed tremendous growth. Initially the airport was built to cope with 10 aircraft and had 22 check-in desks, one arrivals belt and five departure gates. When the new extension is operational we will have 36 check-in desks, three arrivals belts, six open boarding gates.

"Demand for the facilities at Terminal 2 has really taken off in recent years and we look forward to offering our new and existing customers state-of-the-art facilities in a more spacious environment," Langawi added.

Other new facilities at the Terminal 2 extension include a First and Business Class Lounge, a Marhaba ("Welcome") Lounge, a Special Handling Lounge for passengers requiring extra assistance such as wheelchair users or unaccompanied minors, extended duty free, increased car parking, a left luggage store, a visa cancellation desk, a Dnata ticketing desk and additional refreshment stops both before check-in and after passport control.

Behind the scenes, the airport expansion will also include new facilities for Dnata staff, including dedicated office space, a conference room and refreshment facilities, as well as learning resource and training centers, which allow staff to complete their training needs in a comfortable and easy to access environment.

FMI: www.dnata.com, www.dubaiairport.com

Advertisement

More News

ANN's Daily Aero-Linx (04.15.24)

Aero Linx: International Flying Farmers IFF is a not-for-profit organization started in 1944 by farmers who were also private pilots. We have members all across the United States a>[...]

Classic Aero-TV: 'No Other Options' -- The Israeli Air Force's Danny Shapira

From 2017 (YouTube Version): Remembrances Of An Israeli Air Force Test Pilot Early in 2016, ANN contributor Maxine Scheer traveled to Israel, where she had the opportunity to sit d>[...]

Aero-News: Quote of the Day (04.15.24)

"We renegotiated what our debt restructuring is on a lot of our debts, mostly with the family. Those debts are going to be converted into equity..." Source: Excerpts from a short v>[...]

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.16.24): Chart Supplement US

Chart Supplement US A flight information publication designed for use with appropriate IFR or VFR charts which contains data on all airports, seaplane bases, and heliports open to >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC