Shuttle Crew Checks Out Equipment For Return To Flight Mission | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Mar 22, 2005

Shuttle Crew Checks Out Equipment For Return To Flight Mission

The astronauts of the Space Shuttle Discovery got a chance to work with some of the equipment they will be taking to space. Flight commander Eileen Collins and her crew were at NASA's Kennedy Space Center, Fla., for the Payload Crew Equipment Interface Test.

The Return to Flight mission of the Space Shuttle (STS-114) is targeted for launch during a window from May 15 to June 3. Returning the Shuttle to flight and completing the International Space Station are the first steps in the Vision for Space Exploration, a stepping-stone strategy toward new exploration goals. STS-114 is the first of two test flights following the Columbia accident. The seven-member Discovery crew will fly to the Station to evaluate procedures for flight safety, including orbiter inspection and repair techniques, and will deliver much-needed supplies.

The astronauts performed tests today to ensure the equipment for the mission's three spacewalks worked properly, and they inspected the cargo containers installed in the Italian-built Multi-Purpose Logistics Module, called Raffaello. They performed fit checks on the Thermal Protection System (TPS) repair sample box, the Control Moment Gyro (CMG), and the External Stowage Platform-2 (ESP2).

The sample box contains pieces of the Shuttle's heat-shielding tile. The samples will enable the crew to test new on-orbit repair techniques recommended by the Columbia Accident Investigation Board.

The new gyroscope will replace an inoperable one on the International Space Station. CMGs provide attitude control for the Station, keeping it properly positioned in space. The ESP2, similar to a large toolbox, will carry replacement parts to the Station. The platform will be deployed, attached to the Station's airlock and used as a permanent spare parts facility.

FMI: www.nasa.gov

Advertisement

More News

Aero-News: Quote of the Day (04.17.24)

"Sometimes, growth makes it easy to miss the little things, and today's "little guy" is smarting more than ever just looking at the price tags of "cheap" aircraft. Poberezny, seein>[...]

ANN's Daily Aero-Linx (04.17.24)

Aero Linx: Space Medicine Association (SMA) The Space Medicine Association of the Aerospace Medical Association is organized exclusively for charitable, educational, and scientific>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

Airborne 04.11.24: SnF24!, King's 50th, Top Rudder, Aileronics

Also: Flight Club, Jet Shades, MyGoFlight’s FlightFlix Acquisition FIFTY YEARS! What a milestone for the aviation world’s master aero-education duo! John, Martha, along>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC