First Flight: Boeing P-8A Poseidon | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Apr 28, 2009

First Flight: Boeing P-8A Poseidon

Boeing's P-8A Poseidon test aircraft T-1 successfully completed its first flight April 25th, taking off from Renton Field at 10:43 a.m. and touching down at Boeing Field in Seattle at 2:14 p.m. The P-8A performed a series of flight checks, reached a maximum altitude of 25,000 feet, and landed after three hours, 31 minutes in the air.

"This is a significant accomplishment for the P-8A team, as it moves us one step closer to delivering the next maritime patrol and reconnaissance aircraft to the warfighter," said Capt. Mike Moran, P-8A program manager for the U.S. Navy.

"Today's flight is a clear demonstration of the program's commitment to delivering this critical capability on time and the result of a tremendous effort by the joint Navy/Boeing team. I commend Boeing for putting its 'A-Team' in place on this program and enabling the Navy to leverage Boeing's experience, expertise and, more importantly, dedication to make this aircraft a reality."

Prior to takeoff, the P-8A team completed a limited series of flight checks, including engine starts and shutdowns. During the flight, test pilots performed airborne systems checks including engine accelerations and decelerations, autopilot flight modes, and auxiliary power unit shutdowns and starts.

"This is an exciting day for the P-8A program and a tribute to the hard work of the entire team," said Bob Feldmann, Boeing vice president and P-8 program manager. "We understand the needs of the U.S. Navy and maritime patrol community, and we are dedicated to meeting every one of our future milestones on or ahead of plan."

The integrated Navy/Boeing team will begin formal flight testing of the P-8A during the third quarter of this year. Before that, Boeing will paint the aircraft, install additional flight test instrumentation and conduct a series of ground tests.

The P-8A, a derivative of the Next-Generation 737-800, is built by a Boeing-led industry team that includes CFM International, Northrop Grumman, Raytheon, Spirit AeroSystems and GE Aviation. The team currently is assembling and testing the first five P-8As.

The Navy plans to purchase 108 P-8As to replace its fleet of P-3C aircraft. Initial operational capability is planned for 2013.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (04.15.24)

Aero Linx: International Flying Farmers IFF is a not-for-profit organization started in 1944 by farmers who were also private pilots. We have members all across the United States a>[...]

Classic Aero-TV: 'No Other Options' -- The Israeli Air Force's Danny Shapira

From 2017 (YouTube Version): Remembrances Of An Israeli Air Force Test Pilot Early in 2016, ANN contributor Maxine Scheer traveled to Israel, where she had the opportunity to sit d>[...]

Aero-News: Quote of the Day (04.15.24)

"We renegotiated what our debt restructuring is on a lot of our debts, mostly with the family. Those debts are going to be converted into equity..." Source: Excerpts from a short v>[...]

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.16.24): Chart Supplement US

Chart Supplement US A flight information publication designed for use with appropriate IFR or VFR charts which contains data on all airports, seaplane bases, and heliports open to >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC