Boeing Completes P-8A Weapons Separation Wind Tunnel Tests | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Feb 25, 2006

Boeing Completes P-8A Weapons Separation Wind Tunnel Tests

737-Based Aircraft Will Be Able To Launch Missiles, Mines, Torpedoes

Boeing this month successfully completed P-8A Multi-mission Maritime Aircraft (MMA) weapons separation wind tunnel tests at the Arnold Air Force Base Engineering Development Center in Tullahoma, TN.

The tests validated Boeing predictions that the US Navy-required P-8A weapons, which include torpedoes, missiles and naval mines, will safely separate from the aircraft when launched during flight.

"This major milestone moves us significantly closer to the start of flight-testing for weapons separation and also validates the aircraft's design," said Jack Zerr, Boeing vice president and P-8A program manager. "The team performed the tests in half the expected time, which further demonstrates our commitment to keeping the P-8A program on schedule and on budget."

During three weeks and approximately 220 hours of testing Boeing engineers, monitored by Navy personnel, placed weapons on a moveable mount near a 6.2 percent scale P-8A model. As the weapons were moved away from the aircraft at various airspeeds and locations, aerodynamic forces were measured to gauge the effect.

"The Navy is extremely happy about the positive correlation between our predictions and the test data," said Neal Mosbarger, Boeing P-8A Flight Technology manager. "As a result, we likely will be able to reduce the P-8A's flight test hours when we get to that phase of the program."

All P-8A aerodynamic wind tunnel testing is now complete, just 20 months after authorization to proceed with the System Development and Demonstration phase of the program. Overall, Boeing has completed more than 3,100 hours of P-8A wind tunnel testing.

Boeing will continue to analyze the wind tunnel data, which will be used to support the program's Critical Design Review, slated for early 2007.

The P-8A, a 737-800 aircraft, is the Navy's replacement platform for the P-3C. Its primary mission is to provide persistent anti-submarine warfare. In addition, the P-8A MMA will contribute to anti-surface warfare and intelligence, surveillance and reconnaissance warfighting capabilities, as defined in the Sea Shield and FORCEnet elements of the Navy's Sea Power 21 program.

The Navy plans to purchase up to 108 aircraft to replace its aging fleet of P-3 aircraft.

FMI: www.navy.mil, www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (04.15.24)

Aero Linx: International Flying Farmers IFF is a not-for-profit organization started in 1944 by farmers who were also private pilots. We have members all across the United States a>[...]

Classic Aero-TV: 'No Other Options' -- The Israeli Air Force's Danny Shapira

From 2017 (YouTube Version): Remembrances Of An Israeli Air Force Test Pilot Early in 2016, ANN contributor Maxine Scheer traveled to Israel, where she had the opportunity to sit d>[...]

Aero-News: Quote of the Day (04.15.24)

"We renegotiated what our debt restructuring is on a lot of our debts, mostly with the family. Those debts are going to be converted into equity..." Source: Excerpts from a short v>[...]

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.16.24): Chart Supplement US

Chart Supplement US A flight information publication designed for use with appropriate IFR or VFR charts which contains data on all airports, seaplane bases, and heliports open to >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC