Holloman AFB Assists In Transfer Of Orion Test Vehicle | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.09.24

Airborne-Unlimited-04.10.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, Aug 30, 2009

Holloman AFB Assists In Transfer Of Orion Test Vehicle

Next-Gen Spacecraft Stops At Holloman

NASA's next generation of a manned-spacecraft  made a stop at Holloman AFB on its way to White Sands Missile Range, N.M. where launch abort tests will be performed.

The Orion Program's Pad Abort One Crew Module arrived at Holloman Aug. 19, via a C-17 Globemaster III, and left aboard a tractor-trailer Aug. 21 for WSMR. The crew module has a launch abort system used to for the crew to escape from the launch rocket should something go wrong on the pad or during the ascent to orbit.

Holloman AFB was a vital stop because of the base's close proximity to WSMR and its ability to receive aircraft with heavy cargo.

"It would have been pretty much impossible to get this capsule out here if we were unable to land at Holloman," said Jeff Doughty, the Pad Abort One Flight Test Vehicle crew chief.

The base's reliable support also helped in the decision to bring the module through Holloman.

"We've received excellent support from (Holloman)," said David McAllister, the Dryden Flight Research Center lead of operations for the abort flight test. "We feel like we're at home when we're here."

Holloman AFB was just one leg in the spacecraft's journey to WSMR. It was built at NASA Langley, Va., and flown to Dryden Flight Research Center, Edwards, Calif., to have the avionics and instrumentation installed. When installation was complete, the spacecraft was flown to Holloman AFB, then driven to to its final destination at a launch site on WSMR for testing.

Mr. Doughty said the module is going to WSMR to demonstrate that it can be taken away from the launch pad, ensuring astronauts can get away from the pad in the event of an emergency. Billed as the shuttle replacement program for NASA, the Orion Program is designed to take the next generation of astronauts to space.

NASA is expecting the Orion to be sent into orbit toward the end of 2014 or early 2015. [ANN salutes Staff Sgt. Sanjay Allen, 49th Fighter Wing Public Affairs]

FMI: www.nasa.gov, www.af.mil

Advertisement

More News

ANN's Daily Aero-Linx (04.13.24)

Aero Linx: Florida Antique Biplane Association "Biplanes.....outrageous fun since 1903." That quote really defines what the Florida Antique Biplane Association (FABA) is all about.>[...]

ANN's Daily Aero-Term (04.13.24): Beyond Visual Line Of Sight (BVLOS)

Beyond Visual Line Of Sight (BVLOS) The operation of a UAS beyond the visual capability of the flight crew members (i.e., remote pilot in command [RPIC], the person manipulating th>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC