Mon, Sep 25, 2017
First Wide-Body Center To Be Opened Outside Europe
Airbus has inaugurated its A330 Completion and Delivery Center (C&DC) in Tianjin, China, taking additional steps in the expansion of its global footprint and strategic partnership with China. At the same time, the first A330 to be delivered from the C&DC was handed over to Tianjin Airlines.
Located at the same site as the Airbus Tianjin A320 Family Final Assembly Line and the Airbus Tianjin Delivery Center, the A330 C&DC covers the aircraft completion activities including cabin installation, aircraft painting and production flight test, as well as customer flight acceptance and aircraft delivery. Some 150 Chinese staff members of the C&DC were trained by Airbus experts in Toulouse.
The new plant is composed of paint shop, weighing hangar and one main hangar with three aircraft positions.The A330 C&DC in Tianjin will employ more than 250 people and is ready to deliver two aircraft per month by early 2019.
“The inauguration of our A330 C&DC in Tianjin, together with the first of many deliveries, marks a new milestone for Airbus’ international footprint and underlines the strong spirit of cooperation with our Chinese partners,” said Fabrice Brégier, Airbus COO and President of Commercial Aircraft. “Wide-body aircraft completed in China is an Airbus and an industry first which demonstrates our mutual commitment to a strong and growing Chinese aviation sector.”
To celebrate C&DC inauguration, a first A330 aircraft was delivered to Tianjin Airlines. The aircraft which was assembled and equipped in Toulouse with Chinese and European staff is powered by Rolls-Royce Trent 700 engines and is configured in two classes with 260 seats.
By the end of August 2017, the in-service Airbus fleet with Chinese carrier included 1,484 aircraft, 1,282 A320 Family and 202 A330 Family. The A330 is the most popular wide-body aircraft in China operated by nine airlines.
(Images provided with Airbus news release)
More News
"As previously announced on February 29th, our IM-1 mission ended seven days after landing, as Odysseus' mission was not intended to survive the harsh temperatures of the lunar nig>[...]
Marker Beacon An electronic navigation facility transmitting a 75 MHz vertical fan or boneshaped radiation pattern. Marker beacons are identified by their modulation frequency and >[...]
Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]
Also: Moron With A Laser, EAA Aviation Museum, FAA v Santa Monica Propeller Service, Frontier MEC Lauds FO Boom Supersonic has confirmed details surrounding the successful first te>[...]
We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]