ANN's Daily Aero-Term (05.01.06): Early Extended Validation Integration Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne-Unmanned w/AUVSI-
Tuesday

Airborne Unlimited-
Wednesday

AMA Drone Report-
Thursday

Airborne Unlimited-
Friday

Airborne On ANN

Airborne 06.11.18

Airborne-UnManned 06.12.18

Airborne 06.13.18

AMA Drone Report 06.14.18

Airborne 06.15.18

Airborne-YouTube

Airborne 06.11.18

Airborne-UnManned 06.12.18

Airborne 06.13.18

AMA Drone Report 06.14.18

Airborne 06.15.18

Mon, May 01, 2006

ANN's Daily Aero-Term (05.01.06): Early Extended Validation Integration Program

Aero-Terms!

Designed to be a daily reminder of the terms, names, acronyms and explanations of the unique language that populates the aviation world, ANN Contributor Aleta "I'm Not Making An Asterisk Of Myself" Vinas will be selecting... and presenting unique aeronautical terms each day from all tiers of the aviation world...

Aerospace, sport aviation, fixed wing, helo, you name it... it's all fair game and with a full year's selection already coming together, we can assure you that Aero-Terms should serve as a quick but intriguing reminder of the terms you may use every day or an introduction to an aspects of the Aero-World you may not yet be familiar with. ANN also encourages readers to go beyond the FMI link, and further research any intriguing terms.

Cool, no?

Suggestions for future Aero-Terms are ALWAYS welcome, as are additions or discussion of the explanations given for each Aero-Term.

Early Extended Validation Integration Program

An FAA program, first implemented for the Boeing 777, to give "out-of-the-box" ETOPS (Extended Twin-engine operations. FAA designation of over-ocean flights far from possible emergency landing strips, in which the possibility of engine failure in a twin-engine plane represents a heightened risk. ETOPS certification is not normally given to a new passenger aircraft until it has been in regular domestic service for at least a year) clearance to a new plane, rather than waiting for a couple of years of domestic service experience.

FMI: www.aviation-terms.com

Advertisement

More News

Thunderbirds, Snowbirds Head To North Texas

Will Be Performing At The Bell Fort Worth Alliance Air Show Oct. 13-14 The renowned U.S. Air Force Thunderbirds and the Canadian Forces Snowbirds Air Demonstration Squadrons will s>[...]

Chambliss Trains For Red Bull Air Racing Using Hot Air Balloons

Pilot Prepping For Next Races In The Series Air racing is, by any estimation, a specialized skill, and one that required a lot of training. But training for a pylon race like the R>[...]

Aero-News: Quote of the Day (06.18.18)

“It is such an honor to enjoy the continued support of Tuskegee Airmen Charles McGee and George Hardy. For years these gentleman have lent their support to help us create a m>[...]

Klyde Morris (06.18.18)

Klyde... What's All The Fuss About? FMI: www.klydemorris.com>[...]

Airborne 06.15.18: 100LL Replacement Held, B-1 Stand-Down, Missing USAF Officer

Also: Sichuan Airlines Pilot Feted, Emirates Parks 20 Birds, Air Paris Academy Orders Tecnams, Two A380s Scrapped The FAA continues to be committed to evaluating suitable replaceme>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2018 Web Development & Design by Pauli Systems, LC