AD: Honeywell | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 09.19.14 ** HD iPad-Friendly -- Airborne 09.19.14 **
** Airborne 09.17.14 ** HD iPad-Friendly -- Airborne 09.17.14 **
** Airborne 09.15.14 ** HD iPad-Friendly -- Airborne 09.15.14 **

Fri, Jun 24, 2005

AD: Honeywell

AD NUMBER: 2005-13-07
MANUFACTURER: Honeywell
SUBJECT: Airworthiness Directive 2005-13-07
SUMMARY: The FAA is adopting a new airworthiness directive (AD) for Honeywell International Inc. (formerly AlliedSignal Inc. and Garrett Turbine Engine Co.) TFE731-2 and -3 series turbofan engines with certain part numbers (P/Ns) and serial numbers (SNs) of low-pressure (LP) 1st and 2nd stage turbine rotor discs initially installed.

This AD requires replacement of those LP 1st and 2nd stage turbine rotor discs. This AD results from a report of an uncontained failure of an LP 2nd stage turbine rotor disc that resulted in an in-flight engine shutdown. We are issuing this AD to prevent LP turbine rotor disk separation, which could result in an uncontained engine failure and damage to the airplane.

FMI: www.airweb.faa.gov/ad

Advertisement

More News

Airborne 09.17.14: Boeing/SpaceX Win CCtCap, Flying Docs Endorse, Jetpack Bucks

Also: Chris Heintz, Lear 70/75 Certs, Beluga Birthday, Leap Frogs 9/11 Jump Cancelled, Lawyers Sue NTSB The Commercial Spaceflight Federation congratulates NASA and the winners of >[...]

AD: Embraer S.A. Airplanes

AD NUMBER: 2014-19-01 PRODUCT: Embraer S.A. Model EMB-505 airplanes (Phenom 300)>[...]

ANN's Daily Aero-Linx (09.19.14)

Basejumper.com A site dedicated to the sport of BASE jumping. BASE is an acronym which stands for Building, Antenna, Span and Earth.>[...]

ANN's Daily Aero-Term (09.19.14): Breakout

A technique to direct aircraft out of the approach stream. In the context of simultaneous (independent) parallel operations, a breakout is used to direct threatened aircraft away f>[...]

Aero-News: Quote Of The Day (09.19.14)

"We're actually already in the process of putting some framework together, but we're going to hit the ground running when we get back in January." Source: U.S. Representative Sam G>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC