GE Aviation, Emirates Airline Work To Optimize Traffic Flows | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 06.20.16

Airborne 06.21.16

Airborne 06.22.16

Airborne 06.23.16

Airborne 06.24.16

Airborne Hi-Def On YouTube

Airborne 06.20.16

Airborne 06.21.16

Airborne 06.22.16

Airborne 06.23.16

Airborne 06.24.16

AEA2016 LIVE Aero-TV: 04/27-0830ET, 04/28-1400ET, 04/29-1100ET

Sun 'n Fun 2016 Innovation Preview on Vimeo!

Sun 'n Fun 2016 Innovation Preview on YouTube!

Thu, May 31, 2012

GE Aviation, Emirates Airline Work To Optimize Traffic Flows

Project Designed To Reduce Flight Costs, Delays

GE Aviation has been selected by Emirates airline to provide GE’s airline-based flow management system for a 16-month validation at Dubai International Airport. To commence in July, 2012, the Emirates “FLOW Project” will allow the airline to reduce fuel and delay costs, as well as improve their hub passenger-connection schedule at Dubai International Airport by sequencing and spacing the company’s arrivals according to Emirates’ commercial priorities.

“GE’s FLOW solution will optimize Emirates’ traffic flows within the existing air traffic control system,” said Giovanni Spitale, general manager of GE’s PBN Services. “This service will give Emirates increased control over their arrivals and hub schedule, helping to significantly reduce costs of operation.”

GE Aviation will provide the installation, integration and service of the FLOW aircraft arrival management system. Installation is currently taking place at the Emirates Operations Control Centre at the Emirates Group Headquarters with entry into service expected to begin in the autumn this year.

“Emirates has collaborated with GE Aviation to implement the new flow management system here in Dubai. We anticipate that GE’s flow system will bring significant enhancements to our arrival flow in Dubai, leading to an increased aircraft landing rate and runway utilisation. This will improve efficiency, reduce fuel burn and add to our passenger connectivity,” stated Captain Alan Stealey, Emirates Divisional Senior Vice President of Flight Operations.

GE’s FLOW system will be powered by ATH Group’s Attila software. Attila is an airline-based flow management system that provides Required Time of Arrival (RTA) recommendations to each Emirates aircraft to pre-condition the arrival flow into Dubai. The system is capable of taking into account elements like Emirates’ passenger connections, gate availability and fuel consumption. GE Aviation enhances the Attila system with data from and connectivity to Emirates aircraft flight management systems.

FMI: www.ge.com/aviation

Advertisement

More News

Gone West: Aviation Education Leader Thomas Wathen

Founder Of The Tom Wathen Center At Flabob Airport ANN has learned that Tom Wathen, the founder of the Tom Wathen Center at Flabob Airport, has gone west.>[...]

Airborne 06.24.16: ADS-B Analysis, NavWorx Price Drop, ALPA v Transport Canada

Also: Porker Of The Month, Aviation BBB?, Super Puma, AirVenture Events, FedEx 767s, Solar Impulse, Sikorsky Flight Safety Foundation has released the study "Benefits Analysis of S>[...]

Airborne 06.23.16: Solar Impulse In Spain, Terrafugia Approval, Stratolaunch

Also: Twin Otter Rescue, #OSH16Coolest Program, AMA, Charlotte-Douglas, Canadian Astros, Hidden Airline Fees, SpaceX Cargo Launch The flight of the Solar Impulse-2 around the world>[...]

Airborne 06.24.16: ADS-B Analysis, NavWorx Price Drop, ALPA v Transport Canada

Also: Porker Of The Month, Aviation BBB?, Super Puma, AirVenture Events, FedEx 767s, Solar Impulse, Sikorsky Flight Safety Foundation has released the study "Benefits Analysis of S>[...]

The Museum Of Flight Opens Spectacular New Aviation Pavilion

The Three-Acre Exhibit's Unrivaled Collection Of Commercial Aircraft Is A New Seattle Landmark The Museum of Flight on Thursday previewed its new, 3-acre Aviation Pavilion. The 9-s>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2016 Web Development & Design by Pauli Systems, LC